RERA project · Residential/Group Housing

Down by the Water

by TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD · 602 homes · 10.24 acres · 5 towers · Yelahanka

Upcoming Under construction, due May 2031. 5% built with 32% of the time used. 37% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
5% built

Due 31 May 2031. 32% of the time from RERA approval to the deadline has passed.

Built5%
Time used32%
How much is sold?379 left
37% booked

223 of 602 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
59 homes per acre

Similar projects within 3 km: 77 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 14 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?9 due so far
11% on time

Of its 22 RERA projects in Bengaluru Urban: 1 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 13 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2024
  2. Approved by RERA9 Aug 2024
  3. Today24 Oct 2026

    32% of the time to the deadline has passed.

  4. If it slips like a typical project1 Mar 2032

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2634%
Q4 2025-2614%
Q1 2026-275%
Q2 2026-275%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 19%
Tower 25%
Tower 35%
Tower 45%
Tower 51%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

223 booked379 leftQ2 2026-27

Still available: 379 × 3 BHK.

Booked, by type

3 BHK223 of 602

Booked, each quarter

Q3 2025-26194 of 602
Q4 2025-26211 of 602
Q1 2026-27229 of 602
Q2 2026-27223 of 602

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,995 sq ft
185 m² carpet · sizes 1,717–1,995 sq ft (200 at this size)
77 m² land share · 14 m² balcony/terrace · 2 parking spaces
602 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 116 floors
Tower 216 floors
Tower 316 floors
Tower 416 floors
Tower 516 floors

Tower 1: 66 homes, 52 m tall, 2 basements · Tower 2: 134 homes, 52 m tall, 2 basements · Tower 3: 134 homes, 52 m tall, 2 basements · Tower 4: 134 homes, 52 m tall, 2 basements · Tower 5: 134 homes, 52 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project59
Typical within 3 km (94)77
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (95)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
10.24 acres

41,459 m²

Ground covered by buildings
22% of the land

9,173 m²

Floor-area ratio
2.00

Floors built per unit of land: 2.00 m² of floors for each m² of land.

Parking
2.04 per home

1,204 covered, 25 open

Built-up area, all floors
15,18,915 sq ft

1,41,112 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 22 RERA projects of Total Environment on the map

Complaints to RERA about its other projects

The company

Registered as
TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD
Type
Company
Company number
U45202KA1996PTC020790

CIN or LLPIN, from the Registrar of Companies.

PAN
AABCT9452F
GSTIN
29AABCT9452F1Z2
Website
https://www.total-environment.com/

Its other registrations on RERA Karnataka

7 registrations under this company
  • After The Rain Phase III PRM/KA/RERA/1251/309/PR/160825/008002 · approved 16 Aug 2025
  • AFTER THE RAIN-PHASE IIB PRM/KA/RERA/1251/309/PR/191015/002923 · approved 15 Oct 2019
  • The Magic Faraway Tree Phase 2a PRM/KA/RERA/1251/310/PR/181204/002194 · approved 4 Dec 2018
  • After the Rain - Phase II A PRM/KA/RERA/1251/309/PR/180519/001763 · approved 19 May 2018
  • The Magic Faraway Tree Phase 2 PRM/KA/RERA/1251/310/PR/171015/000424 · approved 15 Oct 2017
  • Lost in the Greens PRM/KA/RERA/1251/309/PR/171014/000665 · approved 14 Oct 2017
  • After the Rain- Phase 1 PRM/KA/RERA/1251/309/PR/171014/000483 · approved 14 Oct 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹51.0 crBuilding and development ₹1045.8 crTotal ₹1096.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹17.5 cr₹17.5 cr
Q4 2025-26₹27.0 cr₹157.7 cr
Q1 2026-27₹33.1 cr₹33.1 cr
Q2 2026-27₹16.4 cr₹16.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.09 kmReliable
  • Nearest railway station2.53 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.45 kmCaveat

Hospitals

  • Nearest hospital1.38 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSampigehalli PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km9Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.02 kmReliable
  • Nearest sewage treatment plant0.6 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)1.91 kmCaveat
  • Nearest commercial-airport runway13.78 kmReliable
  • Distance to runway approach-path proxy9.38 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.09199, 77.61111), 2026-10-24. Each figure's source and caveat are in the full report.