Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

DNR PARKLINK PHASE 2

by DNR CORPORATION PVT LTD · 428 homes · 5.00 acres · 3 towers · Bengaluru East

Upcoming Under construction, due May 2029. 58% built with 52% of the time used. 69% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
58% built

Due 31 May 2029. 52% of the time from RERA approval to the deadline has passed.

Built58%
Time used52%
How much is sold?132 left
69% booked

296 of 428 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
86 homes per acre

Similar projects within 3 km: 74 per acre. 75% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 5 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA15 Dec 2023
  2. Work started6 Sep 2024
  3. Today24 Oct 2026

    52% of the time to the deadline has passed.

  4. If it slips like a typical project2 Mar 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2646%
Q4 2025-2653%
Q1 2026-2756%
Q2 2026-2758%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

C10%
D12%
E3%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

296 booked132 leftQ2 2026-27

Still available: 25 × 2 BHK, 7 × 2.5 BHK, 40 × 3 BHK, 60 × 1 BHK.

Booked, by type

2 BHK67 of 92
2.5 BHK35 of 42
3 BHK182 of 222
1 BHK12 of 72

Booked, each quarter

Q3 2025-26239 of 428
Q4 2025-26263 of 428
Q1 2026-27273 of 428
Q2 2026-27296 of 428

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,147 sq ft129 homes106.6 m²
  • 1,244 sq ft92 homes115.6 m²
  • 12,347 sq ft1 home1,147.1 m²
Typically 48 m² land share · 12 m² balcony/terrace · 1 parking space
222 homes · 52% of the project
2 BHK
  • 912 sq ft46 homes84.7 m²
  • 933 sq ft46 homes86.7 m²
Typically 38 m² land share · 7 m² balcony/terrace · 1 parking space
92 homes · 21% of the project
1 BHK
  • 432 sq ft72 homes40.1 m²
Typically 19 m² land share · 4 m² balcony/terrace · 1 parking space
72 homes · 17% of the project
2.5 BHK
  • 1,054 sq ft42 homes97.9 m²
Typically 43 m² land share · 8 m² balcony/terrace · 1 parking space
42 homes · 10% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

C22 floors
D22 floors
E9 floors

C: 178 homes, 73 m tall, 2 basements · D: 178 homes, 73 m tall, 2 basements · E: 72 homes, 37 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project86
Typical within 3 km (81)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project75%
Typical within 3 km (81)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.00 acres

20,247 m²

Ground covered by buildings
18% of the land

3,662 m²

Floor-area ratio
3.00

Floors built per unit of land: 3.00 m² of floors for each m² of land.

Parking
1.12 per home

460 covered, 21 open

Built-up area, all floors
8,27,529 sq ft

76,880 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of DNR CORPORATION PVT LTD on the map

The company

Registered as
DNR CORPORATION PVT LTD
Type
Company
PAN
AACCD8007D
GSTIN
29AACCD8007D1ZW
Website
https://dnrgroup.in

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s Krishnapriya Reality LLP.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹37.3 crBuilding and development ₹200.8 crTotal ₹238.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹27.6 cr₹23.9 cr
Q4 2025-26₹17.1 cr₹15.6 cr
Q1 2026-27₹44.7 cr₹25.3 cr
Q2 2026-27₹76.1 cr₹45.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.22 kmReliable
  • Nearest railway station7.28 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.32 kmCaveat

Hospitals

  • Nearest hospital2.02 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Median pupil-teacher ratio, schools within 1 km12 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.65 kmReliable
  • Nearest sewage treatment plant4 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)5.71 kmCaveat
  • Nearest commercial-airport runway12.74 kmReliable
  • Distance to runway approach-path proxy11.09 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.08003, 77.65398), 2026-10-24. Each figure's source and caveat are in the full report.