RERA project · Residential/Group Housing

DNR PARKLINK PHASE 1

by DNR CORPORATION PRIVATE LIMITED · 356 homes · 3.96 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Dec 2027. 76% built with 73% of the time used. 88% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
76% built

Due 31 Dec 2027. 73% of the time from RERA approval to the deadline has passed.

Built76%
Time used73%
How much is sold?41 left
88% booked

315 of 356 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
90 homes per acre

Similar projects within 3 km: 74 per acre. 75% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 5 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Aug 2023
  2. Approved by RERA4 Aug 2023
  3. Today24 Oct 2026

    73% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2665%
Q4 2025-2673%
Q1 2026-2775%
Q2 2026-2776%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A39%
B27%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

315 booked41 leftQ2 2026-27

Still available: 10 × 2 BHK, 1 × 2.5 BHK, 30 × 3 BHK.

Booked, by type

2 BHK82 of 92
2.5 BHK41 of 42
3 BHK192 of 222

Booked, each quarter

Q3 2025-26314 of 356
Q4 2025-26315 of 356
Q1 2026-27315 of 356
Q2 2026-27315 of 356

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,147 sq ft
107 m² carpet · sizes 1,147–12,347 sq ft (129 at this size)
48 m² land share · 12 m² balcony/terrace · 1 parking space
222 homes · 62% of the project
2 BHK
912 sq ft
85 m² carpet · sizes 912–933 sq ft (46 at this size)
38 m² land share · 7 m² balcony/terrace · 1 parking space
92 homes · 26% of the project
2.5 BHK
1,054 sq ft
98 m² carpet
43 m² land share · 8 m² balcony/terrace · 1 parking space
42 homes · 12% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A22 floors
B22 floors

A: 178 homes, 73 m tall, 2 basements · B: 178 homes, 73 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project90
Typical within 3 km (81)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project75%
Typical within 3 km (81)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.96 acres

16,022 m²

Ground covered by buildings
18% of the land

2,898 m²

Floor-area ratio
3.00

Floors built per unit of land: 3.00 m² of floors for each m² of land.

Parking
1.26 per home

450 covered, 0 open

Built-up area, all floors
7,87,035 sq ft

73,118 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of DNR CORPORATION PVT LTD on the map

The company

Registered as
DNR CORPORATION PRIVATE LIMITED
Type
Company
PAN
AACCD8007D
GSTIN
29AACCD8007D1ZW
Website
https://dnrgroup.in

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s Krishnapriya Reality LLP.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹66.5 crBuilding and development ₹250.0 crTotal ₹316.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹29.1 cr₹25.5 cr
Q4 2025-26₹31.5 cr₹28.9 cr
Q1 2026-27₹18.5 cr₹14.8 cr
Q2 2026-27₹9.2 cr₹7.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.24 kmReliable
  • Nearest railway station7.26 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.32 kmCaveat

Hospitals

  • Nearest hospital2 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Median pupil-teacher ratio, schools within 1 km12 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.63 kmReliable
  • Nearest sewage treatment plant4.01 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)5.7 kmCaveat
  • Nearest commercial-airport runway12.72 kmReliable
  • Distance to runway approach-path proxy11.08 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.08017, 77.65387), 2026-10-24. Each figure's source and caveat are in the full report.