Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Divine Meadows

by MAX GLOBAL Developers · 137 homes · 15.92 acres · 1 tower · Anekal

Past due, no completion filed Past its deadline of 15 Aug 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 15 Aug 2026, and no completion is filed.

How much is sold?52 left
62% booked

85 of 137 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
9 homes per acre

Similar projects within 3 km: 72 per acre. 74% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 4 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2022
  2. Approved by RERA19 Dec 2022
  3. Deadline15 Aug 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2687%
Q4 2025-2695%
Q1 2026-27100%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

85 booked52 leftQ2 2026-27

Still available: 48 × 3 BHK + Media Room, 4 × 4 BHK + Media Room.

Booked, by type

3 BHK + Media Room76 of 124
4 BHK + Media Room9 of 13

Booked, each quarter

Q3 2025-2679 of 137
Q4 2025-2680 of 137
Q1 2026-2782 of 137
Q2 2026-2785 of 137

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK + Media Room
2,428 sq ft
226 m² carpet · sizes 1,676–3,305 sq ft (67 at this size)
163 m² land share · 39 m² balcony/terrace · 2 parking spaces
124 homes · 91% of the project
4 BHK + Media Room
2,787 sq ft
259 m² carpet · sizes 2,787–3,852 sq ft (12 at this size)
195 m² land share · 36 m² balcony/terrace · 2 parking spaces
13 homes · 9% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Divine meadows2 floors

Divine meadows: 137 homes, 10 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project9
Typical within 3 km (39)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project74%
Typical within 3 km (39)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
15.92 acres

64,445 m²

Ground covered by buildings
26% of the land

16,977 m²

Floor-area ratio
0.69

Floors built per unit of land: 0.69 m² of floors for each m² of land.

Parking
2.20 per home

272 covered, 29 open

Built-up area, all floors
4,67,648 sq ft

43,446 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of MAX GLOBAL DEVELOPERS on the map

Complaints to RERA about its other projects

The company

Registered as
MAX GLOBAL Developers
Type
Partnership Firm
PAN
ABJFM0647D
GSTIN
29ABJFM0647D1ZA

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹16.7 crBuilding and development ₹127.4 crTotal ₹144.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹19.0 cr₹14.6 cr
Q4 2025-26₹17.8 cr₹13.1 cr
Q1 2026-27₹22.2 cr₹16.7 cr
Q2 2026-27₹12.9 cr₹9.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station13.29 kmReliable
  • Nearest railway station11.18 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.18 kmCaveat

Hospitals

  • Nearest hospital1.4 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)16.77 kmReliable
  • Nearest sewage treatment plant7.66 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)14.09 kmCaveat
  • Nearest commercial-airport runway36.45 kmReliable
  • Distance to runway approach-path proxy34 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.86761, 77.80061), 2026-10-24. Each figure's source and caveat are in the full report.