Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

DIVINE GREEN LEAF

by M/s GREEN LEAF PROJECTS · 165 homes · 1.84 acres · 1 tower · Yelahanka

Upcoming Under construction, due Dec 2027. 83% built with 71% of the time used. 57% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
83% built

Due 31 Dec 2027. 71% of the time from RERA approval to the deadline has passed.

Built83%
Time used71%
How much is sold?71 left
57% booked

94 of 165 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
90 homes per acre

Similar projects within 3 km: 77 per acre. 57% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started18 Oct 2023
  2. Approved by RERA23 Nov 2023
  3. Today24 Oct 2026

    71% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2665%
Q4 2025-2673%
Q1 2026-2778%
Q2 2026-2783%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

94 booked71 leftQ2 2026-27

Still available: 30 × 2 BHK, 39 × 3 BHK, 2 × COMMERCIAL.

Booked, by type

2 BHK50 of 80
3 BHK44 of 83
COMMERCIAL0 of 2

Booked, each quarter

Q3 2025-2663 of 165
Q4 2025-2693 of 165
Q1 2026-2793 of 165
Q2 2026-2794 of 165

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
981 sq ft
91 m² carpet · sizes 971–1,400 sq ft (36 at this size)
43 m² land share · 8 m² balcony/terrace · 1 parking space
83 homes · 50% of the project
2 BHK
789 sq ft
73 m² carpet
34 m² land share · 5 m² balcony/terrace · 1 parking space
80 homes · 48% of the project
COMMERCIAL
1,508 sq ft
140 m² carpet
60 m² land share · 1 parking space
2 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Divine Green Leaf4 floors

Divine Green Leaf: 165 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project90
Typical within 3 km (50)77
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project57%
Typical within 3 km (51)48%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.84 acres

7,436 m²

Ground covered by buildings
43% of the land

3,209 m²

Floor-area ratio
2.16

Floors built per unit of land: 2.16 m² of floors for each m² of land.

Parking
1.12 per home

185 covered, 0 open

Built-up area, all floors
2,47,710 sq ft

23,013 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of GREEN LEAF PROJECTS on the map

The company

Registered as
M/s GREEN LEAF PROJECTS
Type
Partnership Firm
PAN
AARFG6694D
GSTIN
29AARFG6694D1ZR

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.3 crBuilding and development ₹68.3 crTotal ₹83.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.8 cr₹4.8 cr
Q4 2025-26₹13.6 cr₹13.6 cr
Q1 2026-27₹7.9 cr₹7.9 cr
Q2 2026-27₹82.1 lakh₹82.1 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.06 kmReliable
  • Nearest railway station2.23 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km5Caveat
  • Parks within 1 km11Caveat
  • Nearest lake / water body (≥2 ha)0.42 kmCaveat

Hospitals

  • Nearest hospital0.7 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km23.8 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka New Town PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.72 kmReliable
  • Nearest sewage treatment plant0.58 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)3.16 kmCaveat
  • Nearest commercial-airport runway15.07 kmReliable
  • Distance to runway approach-path proxy8.23 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (13.11478, 77.57395), 2026-10-24. Each figure's source and caveat are in the full report.