Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

DISHA SYMPHONY HEIGHTS

by DISHAHABITAT SHELTERS LLP · 128 homes · 1.98 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2028. 19% built with 33% of the time used. 21% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
19% built

Due 31 Dec 2028. 33% of the time from RERA approval to the deadline has passed.

Built19%
Time used33%
How much is sold?101 left
21% booked

27 of 128 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
65 homes per acre

Similar projects within 3 km: 71 per acre. 73% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA25 Sep 2025
  2. Work started1 Oct 2025
  3. Today24 Oct 2026

    33% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-262%
Q4 2025-269%
Q1 2026-279%
Q2 2026-2719%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

27 booked101 leftQ2 2026-27

Still available: 1 × 2B+2T (N) West Wing, 7 × 3.5 BHK (W) North Wing, 15 × 3B+3T (E) West Wing, 11 × 3B+3T (N) East Wing, 18 × 3B+3T (N) South Wing, 18 × 3B+3T (N) West Wing, 14 × 3B+3T (W) East Wing, 17 × 3B+3T (W) South Wing.

Booked, by type

2B+2T (N) West Wing0 of 1
3.5 BHK (W) North Wing12 of 19
3B+3T (E) West Wing4 of 19
3B+3T (N) East Wing7 of 18
3B+3T (N) South Wing0 of 18
3B+3T (N) West Wing0 of 18
3B+3T (W) East Wing4 of 18
3B+3T (W) South Wing0 of 17

Booked, each quarter

Q3 2025-264 of 128
Q4 2025-266 of 128
Q1 2026-2716 of 128
Q2 2026-2727 of 128

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3.5 BHK (W) North Wing
1,268 sq ft
118 m² carpet
59 m² land share · 8 m² balcony/terrace · 1 parking space
19 homes · 15% of the project
3B+3T (E) West Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
19 homes · 15% of the project
3B+3T (W) East Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
18 homes · 14% of the project
3B+3T (N) East Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
18 homes · 14% of the project
3B+3T (N) South Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
18 homes · 14% of the project
3B+3T (N) West Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
18 homes · 14% of the project
3B+3T (W) South Wing
1,181 sq ft
110 m² carpet
55 m² land share · 11 m² balcony/terrace · 1 parking space
17 homes · 13% of the project
2B+2T (N) West Wing
945 sq ft
88 m² carpet
42 m² land share · 8 m² balcony/terrace · 1 parking space
1 home · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A19 floors

Block A: 128 homes, 64 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project65
Typical within 3 km (74)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project73%
Typical within 3 km (76)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.98 acres

7,993 m²

Ground covered by buildings
27% of the land

2,161 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.19 per home

49 covered, 103 open

Built-up area, all floors
2,41,058 sq ft

22,395 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of DISHAHABITAT SHELTERS LLP on the map

The company

Registered as
DISHAHABITAT SHELTERS LLP
Type
Partnership Firm
Company number
ACD-5188

CIN or LLPIN, from the Registrar of Companies.

PAN
AAVFD8003F
GSTIN
29AAVFD8003F1Z7

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.6 crBuilding and development ₹103.9 crTotal ₹112.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.2 lakh₹0.0 lakh
Q4 2025-26₹45.3 lakh₹0.0 lakh
Q1 2026-27₹1.2 cr₹69.3 lakh
Q2 2026-27₹3.4 cr₹3.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.68 kmReliable
  • Nearest railway station6.13 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.7 kmCaveat

Hospitals

  • Nearest hospital1.56 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km30.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.21 kmReliable
  • Nearest sewage treatment plant2.56 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.52 kmCaveat
  • Nearest commercial-airport runway13.9 kmReliable
  • Distance to runway approach-path proxy12.58 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.06729, 77.66060), 2026-10-24. Each figure's source and caveat are in the full report.