Upcoming Under construction, due Dec 2027. 67% built with 60% of the time used. 72% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
67% built

Due 31 Dec 2027. 60% of the time from RERA approval to the deadline has passed.

Built67%
Time used60%
How much is sold?68 left
72% booked

179 of 247 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
74 homes per acre

Similar projects within 3 km: 70 per acre. 82% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2024
  2. Approved by RERA2 Jan 2025
  3. Today24 Oct 2026

    60% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2625%
Q4 2025-2643%
Q1 2026-2759%
Q2 2026-2767%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A71%
Tower B64%
Tower C75%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

179 booked68 leftQ2 2026-27

Still available: 24 × 2BHK 2T, 21 × 3BHK 2T, 23 × 3BHK 3T.

Booked, by type

2BHK 2T57 of 81
3BHK 2T62 of 83
3BHK 3T60 of 83

Booked, each quarter

Q3 2025-2697 of 247
Q4 2025-26129 of 247
Q1 2026-27152 of 247
Q2 2026-27179 of 247

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK 2T
990 sq ft
92 m² carpet · sizes 959–990 sq ft (68 at this size)
54 m² land share · 8 m² balcony/terrace · 1 parking space
83 homes · 34% of the project
3BHK 3T
1,107 sq ft
103 m² carpet
62 m² land share · 12 m² balcony/terrace · 1 parking space
83 homes · 34% of the project
2BHK 2T
818 sq ft
76 m² carpet · sizes 818–880 sq ft (39 at this size)
44 m² land share · 5 m² balcony/terrace · 1 parking space
81 homes · 33% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A14 floors
Tower B14 floors
Tower C14 floors

Tower A: 83 homes, 45 m tall, 1 basement · Tower B: 81 homes, 45 m tall, 1 basement · Tower C: 83 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project74
Typical within 3 km (73)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project82%
Typical within 3 km (75)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.33 acres

13,456 m²

Ground covered by buildings
18% of the land

2,484 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.18 per home

292 covered, 0 open

Built-up area, all floors
4,66,421 sq ft

43,332 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of DISHAHABITAT SHELTERS LLP on the map

The company

Registered as
DISHAHABITAT SHELTERS LLP
Type
Partnership Firm
Company number
ACD-5188

CIN or LLPIN, from the Registrar of Companies.

PAN
AAVFD8003F
GSTIN
29AAVFD8003F1Z7

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.7 crBuilding and development ₹150.0 crTotal ₹167.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹10.2 cr₹10.4 cr
Q4 2025-26₹23.4 cr₹24.3 cr
Q1 2026-27₹24.9 cr₹24.9 cr
Q2 2026-27₹41.6 cr₹41.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.66 kmReliable
  • Nearest railway station6.13 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.63 kmCaveat

Hospitals

  • Nearest hospital1.64 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.24 kmReliable
  • Nearest sewage treatment plant2.56 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.61 kmCaveat
  • Nearest commercial-airport runway13.88 kmReliable
  • Distance to runway approach-path proxy12.58 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.06733, 77.66146), 2026-10-24. Each figure's source and caveat are in the full report.