by Brigade Tetrarch Private Limited · 1,325 homes · 6.81 acres · 2 towers · Bengaluru North

Upcoming Under construction, due Jun 2028. 61% built with 61% of the time used. 98% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
61% built

Due 30 Jun 2028. 61% of the time from RERA approval to the deadline has passed.

Built61%
Time used61%
How much is sold?28 left
98% booked

1,320 of 1,348 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
194 homes per acre

Similar projects within 3 km: 133 per acre. 72% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 9 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?35 due so far
0% on time

Of its 55 RERA projects in Bengaluru Urban: 0 delivered on time, 23 late (after the date first promised), 12 past due with no completion filed, 18 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started5 Feb 2024
  2. Approved by RERA16 Feb 2024
  3. Today24 Oct 2026

    61% of the time to the deadline has passed.

  4. If it slips like a typical project1 Apr 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2647%
Q4 2025-2651%
Q1 2026-2758%
Q2 2026-2761%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Dioro85%
Beryl17%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

1,320 booked28 leftQ2 2026-27

Still available: 3 × 3 BHK, 2 × 1 BHK, 1 × NA, 22 × SHOP.

Booked, by type

2 BHK130 of 130
3 BHK392 of 395
1 BHK798 of 800
NA0 of 1
SHOP0 of 22

Booked, each quarter

Q3 2025-26523 of 1,348
Q4 2025-261,322 of 1,348
Q1 2026-271,323 of 1,348
Q2 2026-271,320 of 1,348

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

1 BHK
316 sq ft
29 m² carpet
5 m² land share · 1 m² balcony/terrace · 1 parking space
800 homes · 59% of the project
3 BHK
628 sq ft
58 m² carpet · sizes 628–883 sq ft (220 at this size)
11 m² land share · 1 m² balcony/terrace · 1 parking space
395 homes · 29% of the project
2 BHK
592 sq ft
55 m² carpet · sizes 592–624 sq ft (84 at this size)
11 m² land share · 2 m² balcony/terrace · 1 parking space
130 homes · 10% of the project
SHOP
57 sq ft
5 m² carpet · sizes 57–24,106 sq ft (2 at this size)
16 m² land share · 2 parking spaces
22 homes · 2% of the project
NA
61,867 sq ft
5,748 m² carpet
2,000 m² land share · 63 parking spaces
1 home · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Dioro22 floors
Beryl22 floors

Dioro: 525 homes, 68 m tall, 1 basement · Beryl: 823 homes, 72 m tall, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project194
Typical within 3 km (2)133
Typical in the city (114)79

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (2)57%
Typical in the city (118)62%

The share of the land not built on, which includes roads.

Land
6.81 acres

27,578 m²

Ground covered by buildings
28% of the land

7,790 m²

Floor-area ratio
0.16

Floors built per unit of land: 0.16 m² of floors for each m² of land.

Parking
1.62 per home

787 covered, 284 open

Built-up area, all floors
13,87,068 sq ft

1,28,863 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 55 RERA projects of Brigade Group on the map

Complaints to RERA about its other projects

9 complaints across 6 projects. The most complained about:

Show all 6 projects
  • Brigade Insignia 1 complaint

The company

Registered as
Brigade Tetrarch Private Limited
Type
Company
Company number
U92412KA1995PTC018247

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACT7266Q
GSTIN
29AAACT7266Q1ZG
Website
www.brigadegroup.com

Its other registrations on RERA Karnataka

9 registrations under this company
  • Brigade Insignia PRM/KA/RERA/1251/309/PR/180524/006894 · approved 18 May 2024
  • Cobalt at Brigade El Dorado PRM/KA/RERA/1251/309/PR/160524/006878 · approved 16 May 2024
  • Aurum at Brigade El Dorado PRM/KA/RERA/1250/303/PR/230623/006018 · approved 23 Jun 2023
  • Emerald & Luminaire Block at Brigade El Dorado PRM/KA/RERA/1251/309/PR/190722/005089 · approved 19 Jul 2022
  • Krypton at Brigade Eldorado PRM/KA/RERA/1251/309/PR/210518/004158 · approved 18 May 2021
  • Feldspar at Brigade El Dorado PRM/KA/RERA/1251/309/PR/210216/003909 · approved 16 Feb 2021
  • Jasper and Iridium at Brigade El Dorado PRM/KA/RERA/1250/303/PR/200618/003458 · approved 18 Jun 2020
  • Helio at Brigade El Dorado PRM/KA/RERA/1251/472/PR/190913/002889 · approved 13 Sep 2019
  • Gallium at Brigade El Dorado PRM/KA/RERA/1251/472/PR/190427/002540 · approved 27 Apr 2019

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹41.4 crBuilding and development ₹426.8 crTotal ₹468.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹31.2 cr₹28.1 cr
Q4 2025-26₹54.1 cr₹24.9 cr
Q1 2026-27₹7.4 cr₹2.9 cr
Q2 2026-27₹63.6 cr₹14.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station15.98 kmReliable
  • Nearest railway station7.39 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)0.83 kmCaveat

Hospitals

  • Nearest hospital1.28 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.01 kmReliable
  • Nearest sewage treatment plant3.1 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)5.05 kmCaveat
  • Nearest commercial-airport runway5.05 kmReliable
  • Distance to runway approach-path proxy4.42 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.14430, 77.68444), 2026-10-24. Each figure's source and caveat are in the full report.