by DeFINER VENTURES · 36 homes · 0.65 acres · 1 tower · Bengaluru East

Delivered late Completed: the builder filed for completion on 31 Jan 2019, 153 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 31 Jan 2019, 153 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
55 homes per acre

Similar projects within 3 km: 72 per acre. 77% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 7 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 2 past due with no completion filed.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started16 Aug 2016
  2. Approved by RERA8 Dec 2017
  3. Completion filed31 Jan 2019

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
730 sq ft
68 m² carpet
42 m² land share · 30 m² balcony/terrace · 1 parking space
18 homes · 50% of the project
3BHK
902 sq ft
84 m² carpet · sizes 902–964 sq ft (9 at this size)
56 m² land share · 43 m² balcony/terrace · 1 parking space
18 homes · 50% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

D8 floors

D: 36 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project55
Typical within 3 km (33)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project77%
Typical within 3 km (33)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.65 acres

2,630 m²

Ground covered by buildings
23% of the land

605 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of DeFINER Ventures on the map

Complaints to RERA about its other projects

The company

Registered as
DeFINER VENTURES
Type
Partnership Firm

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹65.0 lakh
Construction
₹8.8 cr
Total project cost
₹9.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.68 kmReliable
  • Nearest railway station8.67 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.47 kmCaveat

Hospitals

  • Nearest hospital3.7 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.05 kmReliable
  • Nearest sewage treatment plant1.85 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)10.55 kmCaveat
  • Nearest commercial-airport runway12.99 kmReliable
  • Distance to runway approach-path proxy11.91 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.07353, 77.74680), 2026-10-24. Each figure's source and caveat are in the full report.