Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

DC CAPITOL

by D C HI RISE LLP · 152 homes · 2.10 acres · 1 tower · Bengaluru East

Delivered late Completed: the builder filed for completion on 28 Jun 2024, 606 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 28 Jun 2024, 606 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
72 homes per acre

Similar projects within 3 km: 79 per acre. 50% of the land is left open.

Any complaints?See the list
51 complaints

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started30 Sep 2019
  2. Approved by RERA20 Dec 2019
  3. First promised31 Oct 2022

    The date the builder gave at registration.

  4. Completion filed28 Jun 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
  • 753 sq ft48 homes70.0 m²
  • 786 sq ft12 homes73.0 m²
  • 797 sq ft8 homes74.0 m²
  • 829 sq ft8 homes77.0 m²
  • and 16 homes in other sizes
Typically 52 m² land share · 22 m² balcony/terrace · 1 parking space
92 homes · 61% of the project
3BHK
  • 1,001 sq ft12 homes93.0 m²
  • 915 sq ft8 homes85.0 m²
  • 1,109 sq ft8 homes103.0 m²
  • 883 sq ft4 homes82.0 m²
  • and 28 homes in other sizes
Typically 66 m² land share · 28 m² balcony/terrace · 1 parking space
60 homes · 39% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A4 floors

Block A: 152 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project72
Typical within 3 km (105)79
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (105)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.10 acres

8,497 m²

Ground covered by buildings
50% of the land

4,209 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of D C HI RISE LLP on the map

The company

Registered as
D C HI RISE LLP
Type
Partnership Firm
PAN
AAJFD0654Q

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹4.9 cr
Construction
₹48.5 cr
Total project cost
₹75.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.49 kmReliable
  • Nearest railway station3.4 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km5Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.71 kmCaveat

Hospitals

  • Nearest hospital0.21 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km19.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionMarathahalli PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.76 kmReliable
  • Nearest sewage treatment plant1.24 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.74 kmCaveat
  • Nearest commercial-airport runway27.79 kmReliable
  • Distance to runway approach-path proxy27.32 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.93817, 77.70563), 2026-10-24. Each figure's source and caveat are in the full report.