RERA project · Residential/Group Housing
CoEvolve Northern Star
by CoEvolve Estates Pvt. Ltd. (formerly Asset Handlers Pvt. Ltd.) · 130 homes · 1.65 acres · 1 tower · Bengaluru North
Delivered on time Completed: the builder filed for completion on 31 Mar 2021, by the date it promised.
At a glance
The builder filed for completion on 31 Mar 2021, by the date it promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 79 per acre. 83% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
The RERA page doesn't say.
Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised).
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started19 Dec 2016
- Approved by RERA16 Sep 2017
- First promised31 Mar 2021
The date the builder gave at registration.
- Completion filed31 Mar 2021
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.
Towers
CoEvolve Northern Star: 130 homes, 1 basement
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Jacuzzi
- Childrens Play Area
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.65 acres
- Ground covered by buildings
- 17% of the land
6,677 m²
1,150 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of CoEvolve Estates Pvt. Ltd. (formerly Asset Handlers Pvt. Ltd.) on the map
Complaints to RERA about its other projects
- Asset Arcadia 1 complaint
The company
- Registered as
- CoEvolve Estates Pvt. Ltd. (formerly Asset Handlers Pvt. Ltd.)
- Type
- Company
- Company number
- U07010KA2005PTC036911
- PAN
- AAFCA3311G
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/170916/000151 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
- Windmill Noise Disturbance, Windmill Structure violates Jakkur Flying CLub NOC, BBMP Approved Plan and Occupancy Certificate 17 Apr 2023 · Disposed Authority Fullbench
Documents
63 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹22.0 cr
- Construction
- ₹49.0 cr
- Total project cost
- ₹71.0 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station10.32 kmReliable
- Nearest railway station4.47 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km4Caveat
- Nearest lake / water body (≥2 ha)0.38 kmCaveat
Hospitals
- Nearest hospital1.09 kmCaveat
Schools
- Schools in pincode 560064 (UDISE+ census)240Caveat
- Median pupil-teacher ratio, schools within 1 km26.1 :1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionSampigehalli PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km2Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)3.38 kmReliable
- Nearest sewage treatment plant2.1 kmCaveat
- Industrial zones within 1 km1Caveat
- Nearest airfield runway (any, incl. military)2.57 kmCaveat
- Nearest commercial-airport runway13.96 kmReliable
- Distance to runway approach-path proxy10.65 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (13.08074, 77.62491), 2026-10-24. Each figure's source and caveat are in the full report.