RERA project · Residential/Group Housing

Cloud Forest

by Shreno Limited · 798 homes · 9.38 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Oct 2029. 38% built with 31% of the time used. 59% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
38% built

Due 31 Oct 2029. 31% of the time from RERA approval to the deadline has passed.

Built38%
Time used31%
How much is sold?328 left
59% booked

470 of 798 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
85 homes per acre

Similar projects within 3 km: 75 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started24 May 2025
  2. Approved by RERA25 Jun 2025
  3. Today24 Oct 2026

    31% of the time to the deadline has passed.

  4. If it slips like a typical project2 Aug 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2616%
Q4 2025-2625%
Q1 2026-2731%
Q2 2026-2738%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A16%
Tower B24%
Tower C16%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

470 booked328 leftQ2 2026-27

Still available: 103 × 2 BHK, 147 × 3 BHK, 78 × 3.5 BHK.

Booked, by type

2 BHK137 of 240
3 BHK201 of 348
3.5 BHK132 of 210

Booked, each quarter

Q3 2025-26339 of 798
Q4 2025-26402 of 798
Q1 2026-27434 of 798
Q2 2026-27470 of 798

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,197 sq ft
111 m² carpet · sizes 1,095–1,197 sq ft (210 at this size)
45 m² land share · 13 m² balcony/terrace · 1 parking space
348 homes · 44% of the project
2 BHK
842 sq ft
78 m² carpet · sizes 842–898 sq ft (210 at this size)
32 m² land share · 9 m² balcony/terrace · 1 parking space
240 homes · 30% of the project
3.5 BHK
1,321 sq ft
123 m² carpet
50 m² land share · 14 m² balcony/terrace · 1 parking space
210 homes · 26% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A34 floors
Tower B34 floors
Tower C34 floors

Tower A: 266 homes, 106 m tall · Tower B: 266 homes, 106 m tall · Tower C: 266 homes, 106 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project85
Typical within 3 km (87)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (87)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
9.38 acres

37,945 m²

Ground covered by buildings
22% of the land

8,433 m²

Floor-area ratio
3.25

Floors built per unit of land: 3.25 m² of floors for each m² of land.

Parking
1.33 per home

1,041 covered, 24 open

Built-up area, all floors
17,08,489 sq ft

1,58,724 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Shreno Ltd on the map

Complaints to RERA about its other projects

The company

Registered as
Shreno Limited
Type
Company
Company number
U26100GJ1944PLC000345

CIN or LLPIN, from the Registrar of Companies.

PAN
AABCA7953Q
GSTIN
29AABCA7953Q1ZW

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹322.2 crBuilding and development ₹559.8 crTotal ₹882.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹47.6 cr₹34.5 cr
Q4 2025-26₹125.4 cr₹90.3 cr
Q1 2026-27₹56.1 cr₹43.7 cr
Q2 2026-27₹113.8 cr₹87.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.44 kmReliable
  • Nearest railway station1.19 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)1.69 kmCaveat

Hospitals

  • Nearest hospital1.15 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km20.3 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km9Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.99 kmReliable
  • Nearest sewage treatment plant2.32 kmCaveat
  • Industrial zones within 1 km5Caveat
  • Nearest airfield runway (any, incl. military)5.51 kmCaveat
  • Nearest commercial-airport runway22.7 kmReliable
  • Distance to runway approach-path proxy21.32 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.98625, 77.75782), 2026-10-24. Each figure's source and caveat are in the full report.