RERA project · Residential/Group Housing
CityVille Valmark Phase 2B
by VALMARK DEVELOPERS PRIVATE LIMITED · 297 homes · 27.82 acres · 7 towers · Bengaluru South
Upcoming Under construction, due Sep 2031. 15% built with 16% of the time used. 12% of homes booked.
At a glance
Due 30 Sep 2031. 16% of the time from RERA approval to the deadline has passed.
36 of 298 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 75 per acre. 54% of the land is left open.
Complaints to RERA about this project. 3 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 2 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started16 Oct 2025
- Approved by RERA27 Nov 2025
- Today24 Oct 2026
16% of the time to the deadline has passed.
- Deadline30 Sep 2031
The date it must be complete by.
- If it slips like a typical project1 Jul 2032
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 111 × 3 BHK, 115 × 4 BHK, 4 × 1 BHK, 31 × 2 BHK, 1 × NA.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Block-1: 38 homes, 15 m tall · Block-2: 58 homes, 15 m tall · Block-7: 50 homes, 15 m tall · Block-11: 16 homes, 15 m tall · Block-15: 76 homes, 15 m tall · Block-16: 24 homes, 15 m tall · Block-17: 36 homes, 15 m tall
Amenities
- Electricity 6,759 m²
- CCTV Surveillance 450 m²
- Club House 2,804 m²
- Community Hall 428 m²
- Outdoor Sports facility 1,986 m²
- Indoor Sports facility 617 m²
- Swimming Pool 187 m²
- Gym 91 m²
- Parks 11,332 m²
- Power Backup 1 m²
- Water and Sanitation 813 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 27.82 acres
- Ground covered by buildings
- 46% of the land
- Floor-area ratio
- 2.00
- Parking
- 1.76 per home
- Built-up area, all floors
- 8,88,269 sq ft
1,12,602 m²
51,957 m²
Floors built per unit of land: 2.00 m² of floors for each m² of land.
0 covered, 522 open
82,523 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of VALMARK DEVELOPERS PRIVATE LIMITED on the map
Complaints to RERA about its other projects
- Cityville Valmark 3 complaints
The company
- Registered as
- VALMARK DEVELOPERS PRIVATE LIMITED
- Type
- Company
- Company number
- U70102KA2006PTC040887
- PAN
- AACCV4484G
- GSTIN
- 29AACCV4484G1ZZ
- Website
- www.valmark.in
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- CityVille Valmark Phase 2A PRM/KA/RERA/1251/310/PR/300124/006595 · approved 30 Jan 2024
- Cityville Valmark PRM/KA/RERA/1251/310/PR/171222/000914 · approved 22 Dec 2017
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/271125/008281 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Addl.Dir/JDSOUTH/0053/24-25 · 15 Oct 2025
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
295 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹3.0 cr | ₹3.0 cr |
| Q4 2025-26 | ₹12.9 cr | ₹9.0 cr |
| Q1 2026-27 | ₹9.4 cr | ₹6.6 cr |
| Q2 2026-27 | ₹21.8 cr | ₹15.2 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station4.48 kmReliable
- Nearest railway station11.78 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km14Caveat
- Nearest lake / water body (≥2 ha)0.46 kmCaveat
Hospitals
- Nearest hospital0.81 kmCaveat
Schools
- Schools in pincode 560076 (UDISE+ census)85Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
- Schools with library + playground + ICT lab (1 km)4Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionHulimavu PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well10.8 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)4.12 kmReliable
- Nearest sewage treatment plant0.21 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)10.54 kmCaveat
- Nearest commercial-airport runway36.91 kmReliable
- Distance to runway approach-path proxy34.35 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)1Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (12.86617, 77.60572), 2026-10-24. Each figure's source and caveat are in the full report.