Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Century Novus

by TALREJA REALTY LLP · 234 homes · 2.34 acres · 2 towers · Bengaluru North

Upcoming Under construction, due Aug 2027. 100% built with 81% of the time used. 91% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 31 Aug 2027. 81% of the time from RERA approval to the deadline has passed.

Built100%
Time used81%
How much is sold?20 left
91% booked

214 of 234 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
100 homes per acre

Similar projects within 3 km: 71 per acre. 56% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Mar 2023
  2. Approved by RERA10 Apr 2023
  3. Today24 Oct 2026

    81% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2678%
Q4 2025-2680%
Q1 2026-2782%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A95%
B95%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

214 booked20 leftQ2 2026-27

Still available: 13 × 2 BHK, 7 × 3 BHK.

Booked, by type

2 BHK111 of 124
3 BHK103 of 110

Booked, each quarter

Q3 2025-26218 of 234
Q4 2025-26218 of 234
Q1 2026-27219 of 234
Q2 2026-27214 of 234

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 644 sq ft60 homes59.8 m²
  • 670 sq ft48 homes62.2 m²
  • 673 sq ft12 homes62.5 m²
  • 713 sq ft2 homes66.2 m²
  • and 2 homes in other sizes
Typically 35 m² land share · 4 m² balcony/terrace · 1 parking space
124 homes · 53% of the project
3 BHK
  • 836 sq ft38 homes77.7 m²
  • 978 sq ft36 homes90.9 m²
  • 849 sq ft18 homes78.9 m²
  • 976 sq ft12 homes90.7 m²
  • and 6 homes in other sizes
Typically 44 m² land share · 4 m² balcony/terrace · 1 parking space
110 homes · 47% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A12 floors
B12 floors

A: 117 homes, 41 m tall, 1 basement · B: 117 homes, 41 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project100
Typical within 3 km (83)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project56%
Typical within 3 km (85)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.34 acres

9,475 m²

Ground covered by buildings
44% of the land

4,141 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.17 per home

238 covered, 36 open

Built-up area, all floors
3,76,026 sq ft

34,934 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
TALREJA REALTY LLP
Type
Other ( Limited Liability Partnership )
Company number
AAY-1622

CIN or LLPIN, from the Registrar of Companies.

PAN
AATFT3639D
GSTIN
29AATFT3639D1ZP

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹36.5 crBuilding and development ₹121.2 crTotal ₹157.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹9.0 cr₹6.4 cr
Q4 2025-26₹1.3 cr₹90.5 lakh
Q1 2026-27₹7.1 cr₹4.3 cr
Q2 2026-27₹4.1 cr₹2.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.09 kmReliable
  • Nearest railway station2.44 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)0.69 kmCaveat

Hospitals

  • Nearest hospital1.1 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)31 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km4Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.99 kmReliable
  • Nearest sewage treatment plant0.96 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)0.99 kmCaveat
  • Nearest commercial-airport runway14.78 kmReliable
  • Distance to runway approach-path proxy10.09 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.08626, 77.60370), 2026-10-24. Each figure's source and caveat are in the full report.