RERA project · Residential/Group Housing
Casagrand Orlena
by Casa Grande Garden City Builders Pvt ltd · 296 homes · 3.99 acres · 2 towers · Bengaluru East
Past due, no completion filed Past its deadline of 21 Aug 2025, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.
At a glance
The deadline was 21 Aug 2025, and no completion is filed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 76 per acre. 66% of the land is left open.
Complaints to RERA about this project. 65 more about the builder's other projects.
The RERA page doesn't say.
Of its 22 RERA projects in Bengaluru Urban: 1 delivered on time, 3 late (after the date first promised), 7 past due with no completion filed, 11 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Sep 2021
- Approved by RERA28 Sep 2021
- First promised21 Aug 2024
The date the builder gave at registration.
- Deadline (extended)21 Aug 2025
Passed with no completion filed.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Building 1: 112 homes, 1 basement · Building 2: 184 homes, 1 basement
Amenities
- Electricity
- Smart Home Automation
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 3.99 acres
- Ground covered by buildings
- 34% of the land
16,161 m²
5,433 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 22 RERA projects of Casagrand on the map
Complaints to RERA about its other projects
65 complaints across 13 projects. The most complained about:
- Casagrand Meridian 13 complaints
- Casagrand Florella 12 complaints
- Casa Grande Lorenza 7 complaints
- CASAGRAND HAZEN 7 complaints
- CASAGRAND ZAIDEN 5 complaints
Show all 13 projects
- CASAGRAND AQUENE 5 complaints
- CASAGRAND GALILEO 4 complaints
- Casagrand Royce 3 complaints
- Casagrand Keatsway 3 complaints
- Casagrand Florella Phase 2 2 complaints
- CASAGRAND VIVACITY 2 complaints
- CASAGRAND AMOR 1 complaint
- CASAGRAND MOONDANCE 1 complaint
The company
- Registered as
- Casa Grande Garden City Builders Pvt ltd
- Type
- Company
- Company number
- U45400TN2018PTC125174
- PAN
- AAGCC1577R
CIN or LLPIN, from the Registrar of Companies.
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/210928/004324 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
- Delivery date expiry 4 Oct 2024 · Disposed Authority Bench4
- Deviation in Approved Building Plan, Non-Disclosure, and Refusal to Share Updated Plans 8 Jan 2025 · Disposed Authority Bench4
- Delayed possession of my flat at CASAGRAND ORLENA(APPLICATION NO. 1400043579), Apartment No. C Block 306, Building No. 2, developed by CASAGRANDE GARDEN CITY BUILDERS PRIVATE LIMITED 19 Mar 2025 · Disposed Authority Bench4
- Changes in layout and denial of penalty reimbursement for possession delay 19 Mar 2025 · Disposed Authority Bench4
- Interest on delay period for Unit No. A604 in the project Casagrand Orlena (RERA: PRM/KA/RERA/1251/446/PR/210928/004324) 20 Mar 2025 · Disposed Authority Bench4
- Material Alteration Complaint – Clubhouse Relocation Without Buyer Consent – Unit A604, CG-ORLENA 21 Mar 2025 · Disposed Ao
- Project plan change without buyer consent and delay in handover 3 Apr 2025 · Disposed Authority Bench4
- Complaint Regarding Change in Project Plan - Relocation of Clubhouse in "CASAGRAND ORLENA" - RERA Registration No. PRM/KA/RERA/1251/446/PR/210928/004324 9 Apr 2025 · Disposed Authority Bench4
- Complaint Regarding Unauthorized Change in Approved Building Plan and Wrongful Sale of Flat - Request for Compensation 11 Apr 2025 · Disposed Ao
- Delayed pocession of my flat c706 at casagrand orlena, developed by casagrande gardencity builders pvt ltd. 12 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 13 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 13 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 14 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 17 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 19 May 2025 · Disposed Authority Bench4
- Non-disclosure of Litigation Leading to Project Delays and Changes in Amenity Delivery 19 May 2025 · Disposed Authority Bench4
- Misrepresentation of Project details and Non disclosure of Litigation leading to Delay in completion of the project resulting in affecting us financially as EMI is collected every month 12 Jun 2025 · Disposed Authority Bench4
- Delay in possession 17 Jun 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and ameneties delivery 20 Jun 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 30 Jun 2025 · Posted For Orders Authority Bench4
- Complaint Against Casagrande regarding non-Disclosure of Material Facts and delay in delivery of project 1 Jul 2025 · Disposed Authority Bench4
- failure to hand over the possession of the flat to the complainant as per the agreement dated 25.02.2022 20 Aug 2025 · Disposed Authority Bench4
- non compliance of registered agreement of sale dated 13.04.2022 i.e., in respect of delivery of possession 28 Aug 2025 · Disposed Authority Bench4
- seeking compensation for non compliance of sale agreement dated 07.07.2022 and delay in possession even to this day 28 Aug 2025 · Disposed Authority Bench4
- delay for compensation for non-compliance of sale agreement dated/ delayed possession 1 Sep 2025 · Disposed Authority Bench4
- Alteration / Change in the Project plan and non-disclosure of litigation leading to Delay in flat Handover 6 Sep 2025 · Disposed Authority Bench4
- to pay the necessary compensation towards the failure of handing over the possession within time. 6 Sep 2025 · Disposed Authority Bench4
- compensation of non compliance of the sale agreement dated 21.09.2023 i.e., delay or failure to handover the possession within time 12 Sep 2025 · Disposed Authority Bench4
- compensation of non compliance of the sale agreement dated 28-03-2022 i.e., delay or failure to handover the possession within time. 29 Sep 2025 · Disposed Authority Bench4
- compensation of non compliance of the sale agreement dated 21.09.2023 i.e., delay or failure to handover the possession within time 9 Oct 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 11 Nov 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completionand Amenity Delivery 12 Nov 2025 · Disposed Authority Bench4
- Interest on delay of non compliance of the sale agreement dated 22-08-2024 i.e., to handover the possession of the flat 17 Nov 2025 · Disposed Authority Bench4
- Delay in possession 21 Nov 2025 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 20 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse and mental agony 22 Dec 2025 · Disposed Ao
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 26 Dec 2025 · Disposed Authority Bench4
- compensation for change in clubhouse plan and mental agony 29 Dec 2025 · Disposed Ao
- compensation for change in clubhouse plan and mental agony 29 Dec 2025 · Disposed Ao
- Compensation for change of club house plan without consent and for mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse house plan and for mental agony 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse house plan and for mental agon 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse house plan and for mental agony 29 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 31 Dec 2025 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 2 Jan 2026 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 2 Jan 2026 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 5 Jan 2026 · Disposed Ao
- Compensation for change of clubhouse plan and mental agony 8 Jan 2026 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 12 Jan 2026 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 5 Feb 2026 · Disposed Ao
- Compensation towards delay in Handing over the apartment 17 Feb 2026 · Disposed Authority Bench4
- Breach of Agreement Complaint Section : 12 - Regarding veracity of the advertisement 14 - Adherence of sanctioned plan and specifications 18 - Return of amount and compensation 19 - Rights and duties 19 Feb 2026 · Disposed Authority Bench4
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 17 Mar 2026 · Disposed Ao
- interest on delay period towards handing over possession of flat 17 Mar 2026 · Disposed Authority Bench4
- interest on delay period towards handing over possession of flat 17 Mar 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 23 Mar 2026 · Disposed Ao
- Compensation for change of clubhouse plan without customer's consent and mental agony thereby caused 23 Mar 2026 · Disposed Ao
- mental agony, harrassment in respect to failure of following the plan 26 Mar 2026 · Disposed Ao
- delay for compensation for non-compliance of sale agreement dated/ delayed possession 26 Mar 2026 · Disposed Authority Bench4
- delay in interest towards handing over possession of flat 26 Mar 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 26 Mar 2026 · Disposed Ao
- PROJECT IS DELAYED FROM OCT 2023 TO TILL DATE - BREACH OF CONTRACT - NON COMPLETION OF PROJECT MODIFICATION OF SANCTIONED PLAN WITHOUT CUSTOMER CONSENT 1 Apr 2026 · Disposed Authority Bench4
- Seeking delay in possession towards handing over the possession of my flat 1 Apr 2026 · Disposed Authority Bench4
- compensation for mental agony, harassment in respect to failure of following the plan 6 Apr 2026 · Disposed Ao
- interest on delay period towards handing over possession of flat 8 Apr 2026 · Disposed Authority Bench4
- interest on delay period towards handing over possession of flat 8 Apr 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 9 Apr 2026 · Disposed Ao
- mental agony, harassment in respect to failure of following the plan 16 Apr 2026 · Disposed Ao
- mental agony, harassment in respect to failure of following the plan 16 Apr 2026 · Disposed Ao
- Complaint Against Builder for Project Delay, Breach of Contract, and Unauthorized Modification of Sanctioned Plan – Request for Compensation 16 Apr 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 21 Apr 2026 · Disposed Ao
- interest on delay period towards handing over possession of flat 21 Apr 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 21 Apr 2026 · Disposed Ao
- Delay in possession and claim for compensation – Casagrand Orlena (RERA No. PRM/KA/RERA/1251/446/PR/210928/004324) 22 Apr 2026 · Disposed Authority Bench4
- Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery 22 Apr 2026 · Disposed Authority Bench4
- interest on delay period towards handing over possession of flat 2 May 2026 · Disposed Authority Bench4
- interest on delay period towards handing over possession of flat 5 May 2026 · Disposed Authority Bench4
- delay in interest towards handing over possession of flat 6 May 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 6 May 2026 · Disposed Ao
- mental agony, harassment in respect to failure of following the plan 7 May 2026 · Disposed Ao
- Delay in possession 7 May 2026 · Disposed Authority Bench4
- interest on delay period towards handing over possession of flat 13 May 2026 · Disposed Authority Bench4
- mental agony, harassment in respect to failure of following the plan 13 May 2026 · Disposed Ao
- mental agony, harassment in respect to failure of following the plan 13 May 2026 · Disposed Ao
- mental agony, harrassment in respect to failure of following the plan 29 May 2026 · Disposed Ao
- mental agony, harrassment in respect to failure of following the plan 29 May 2026 · Disposed Ao
- compensation of non compliance of the sale agreement dated 16.2.2022 i.e., delay or failure to handover the possession within time 19 Jun 2026 · Under Enquiry Authority Bench6
- mental agony, harrassment in respect to failure of following the plan 19 Jun 2026 · Disposed Ao
- Complaint under Section 31 of RERA for delayed possession and claim for monthly interest/compensation under Section 18 of the Act 2 Jul 2026 · Under Enquiry Authority Bench6
- The respondent has failed to hand over the possession on time and misrepresentation and breach of Agreement. 16 Jul 2026 · Under Enquiry Authority Bench6
- interest on delay period towards handing over possession of flat 27 Jul 2026 · Under Enquiry Authority Bench6
- mental agony, harassment in respect to failure of following the plan 27 Jul 2026 · Under Enquiry Ao
- DELAY IN HANDING OVER POSSESSION AND COMPENSATION UNDER SECTION 18 OF THE RERA ACT 5 Aug 2026 · Under Enquiry Authority Bench6
- interest on delay 5 Aug 2026 · Under Enquiry Authority Bench6
- DELAY/ CLUBHOUSE LAND MISSING/ COMPENSATION 10 Aug 2026 · Under Enquiry Authority Bench6
- Compensation for delay along with interest and Misrepresentation of Project Details and Non-disclosure of Litigation Leading to Delay in Completion and Amenity Delivery to me 25 Aug 2026 · Under Enquiry Authority Bench6
- Delay in Possession, mental agony, no proper response from the builder 3 Sep 2026 · Under Enquiry Authority Bench6
- Delay in possession of Apartment D507, Casagrand Orlena – claim for delay interest/compensation under Section 18 of RERA Act 12 Oct 2026 · Scrutiny Completed
Documents
98 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹6.8 cr
- Construction
- ₹81.7 cr
- Total project cost
- ₹88.4 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station6.16 kmReliable
- Nearest railway station4.26 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km3Caveat
- Nearest lake / water body (≥2 ha)2.16 kmCaveat
Hospitals
- Nearest hospital0.74 kmCaveat
Schools
- Schools in pincode 560077 (UDISE+ census)123Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km18Caveat
- Median pupil-teacher ratio, schools within 1 km21.6 :1Caveat
- Schools with library + playground + ICT lab (1 km)6Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionHennur PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km2Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)6.65 kmReliable
- Nearest sewage treatment plant1.08 kmCaveat
- Industrial zones within 1 km6Caveat
- Nearest airfield runway (any, incl. military)5.21 kmCaveat
- Nearest commercial-airport runway17.2 kmReliable
- Distance to runway approach-path proxy14.84 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)2Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat
ReliableFrom our location report at the builder-entered pin (13.04377, 77.63489), 2026-10-24. Each figure's source and caveat are in the full report.