Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

CANDEUR SUNSHINE

by CANDEUR CONSTRUCTIONS · 300 homes · 3.78 acres · 2 towers · Bengaluru East

Delivered on time Completed: the builder filed for completion on 31 Dec 2024, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 31 Dec 2024, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
79 homes per acre

Similar projects within 3 km: 81 per acre. 4% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
67% on time

Of its 4 RERA projects in Bengaluru Urban: 2 delivered on time, 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started14 Jul 2021
  2. Approved by RERA29 Dec 2021
  3. Completion filed31 Dec 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3.0BHK
1,044 sq ft
97 m² carpet · sizes 1,027–1,053 sq ft (28 at this size)
53 m² land share · 1 parking space
140 homes · 47% of the project
2.0BHK
758 sq ft
70 m² carpet · sizes 758–802 sq ft (42 at this size)
39 m² land share · 1 parking space
132 homes · 44% of the project
2.5BHK
902 sq ft
84 m² carpet
48 m² land share · 1 parking space
28 homes · 9% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Citrine - Tower A13 floors
Garnet - Tower B13 floors

Citrine - Tower A: 150 homes, 1 basement · Garnet - Tower B: 150 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project79
Typical within 3 km (90)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project4%
Typical within 3 km (92)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.78 acres

15,284 m²

Ground covered by buildings
95% of the land

14,592 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of Candeur Constructions on the map

The company

Registered as
CANDEUR CONSTRUCTIONS
Type
Partnership Firm
PAN
AAOFC5170H

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹11.5 cr
Construction
₹105.3 cr
Total project cost
₹116.9 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.14 kmReliable
  • Nearest railway station3.39 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.75 kmCaveat

Hospitals

  • Nearest hospital1.92 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Median pupil-teacher ratio, schools within 1 km33.5 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km8Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.38 kmReliable
  • Nearest sewage treatment plant1.24 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)7.92 kmCaveat
  • Nearest commercial-airport runway20.27 kmReliable
  • Distance to runway approach-path proxy19.52 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.00605, 77.73172), 2026-10-24. Each figure's source and caveat are in the full report.