Upcoming Under construction, due Dec 2029. 46% built with 34% of the time used. 33% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
46% built

Due 31 Dec 2029. 34% of the time from RERA approval to the deadline has passed.

Built46%
Time used34%
How much is sold?70 left
33% booked

34 of 104 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
77 homes per acre

Similar projects within 3 km: 74 per acre. 64% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started20 Nov 2024
  2. Approved by RERA18 Feb 2025
  3. Today24 Oct 2026

    34% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2631%
Q4 2025-2633%
Q1 2026-2738%
Q2 2026-2746%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

34 booked70 leftQ2 2026-27

Still available: 45 × 2 BHK, 25 × 3 BHK.

Booked, by type

2 BHK14 of 59
3 BHK20 of 45

Booked, each quarter

Q3 2025-2621 of 104
Q4 2025-2627 of 104
Q1 2026-2726 of 104
Q2 2026-2734 of 104

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
817 sq ft
76 m² carpet · sizes 787–888 sq ft (17 at this size)
24 m² land share · 6 m² balcony/terrace · 1 parking space
59 homes · 57% of the project
3 BHK
946 sq ft
88 m² carpet · sizes 817–1,088 sq ft (7 at this size)
30 m² land share · 10 m² balcony/terrace · 1 parking space
45 homes · 43% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

BRR North Excellency phase- 16 floors

BRR North Excellency phase- 1: 104 homes, 21 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project77
Typical within 3 km (90)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project64%
Typical within 3 km (91)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.35 acres

5,480 m²

Ground covered by buildings
36% of the land

1,964 m²

Floor-area ratio
2.18

Floors built per unit of land: 2.18 m² of floors for each m² of land.

Parking
2.78 per home

279 covered, 10 open

Built-up area, all floors
2,45,675 sq ft

22,824 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of BRR HALLMARK DEVELOPERS LLP on the map

The company

Registered as
BRR Hallmark Developers LLP
Type
Partnership Firm
PAN
AATFB5858J
GSTIN
29AATFB5858JZ1L

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.1 crBuilding and development ₹50.5 crTotal ₹65.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹2.5 cr₹2.6 cr
Q4 2025-26₹1.4 cr₹1.4 cr
Q1 2026-27₹3.4 cr₹2.4 cr
Q2 2026-27₹4.4 cr₹3.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.69 kmReliable
  • Nearest railway station5.58 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)2.07 kmCaveat

Hospitals

  • Nearest hospital0.57 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km18Caveat
  • Median pupil-teacher ratio, schools within 1 km22.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)8Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionHennur PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.07 kmReliable
  • Nearest sewage treatment plant1.95 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)4.24 kmCaveat
  • Nearest commercial-airport runway15.7 kmReliable
  • Distance to runway approach-path proxy13.25 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.05829, 77.63516), 2026-10-24. Each figure's source and caveat are in the full report.