Neighborhood IntelOpen on the map

RERA project · Commercial

Brigade WTC Annexe

by Brigade Enterprises Ltd · 11 homes · 1.07 acres · 1 tower · Bengaluru North

Past due, no completion filed Past its deadline of 30 Jan 2024, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 30 Jan 2024, and no completion is filed.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
10 homes per acre

Similar projects within 3 km: 8 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 44 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?35 due so far
0% on time

Of its 55 RERA projects in Bengaluru Urban: 0 delivered on time, 23 late (after the date first promised), 12 past due with no completion filed, 18 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started12 Dec 2019
  2. Approved by RERA20 Dec 2019
  3. First promised30 Apr 2023

    The date the builder gave at registration.

  4. Deadline (extended)30 Jan 2024

    Passed with no completion filed.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

COMMERCIAL
7,169 sq ft
666 m² carpet · sizes 2,490–7,169 sq ft (7 at this size)
409 m² land share · 105 m² balcony/terrace · 9 parking spaces
11 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A10 floors

Tower A: 11 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project10
Typical within 3 km (4)8
Typical in the city (76)14

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (4)69%
Typical in the city (76)64%

The share of the land not built on, which includes roads.

Land
1.07 acres

4,310 m²

Ground covered by buildings
22% of the land

945 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active commercial projects with a land area on RERA; the comparison is ours.

Who is building it?

All 55 RERA projects of Brigade Group on the map

Complaints to RERA about its other projects

44 complaints across 20 projects. The most complained about:

Show all 20 projects
  • Brigade Buena Vista-Phase 2 2 complaints
  • Brigade Woods 2 complaints
  • Brigade Parkside East 2 complaints
  • Brigade 7 Gardens 2 complaints
  • Brigade Laguna 2 complaints
  • Brigade Parkside North 2 complaints
  • Brigade Northridge Neo 2 complaints
  • Brigade Oasis - Phase 3 2 complaints
  • Brigade Oak Tree Place 2 complaints
  • Brigade Lakefront - Crimson 1 complaint
  • Plumeria Phase 1 at Brigade Meadows 1 complaint
  • Brillio and Commercial at Brigade Valencia 1 complaint
  • Brigade Eternia 1 complaint
  • BRIGADE KOMARLA HEIGHTS 1 complaint
  • Brigade Oasis - Phase 1 1 complaint

The company

Registered as
Brigade Enterprises Ltd
Type
Company
Company number
L85110KA1995PLC019126

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACB7459F

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹59.9 cr
Construction
₹53.0 cr
Total project cost
₹112.9 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.22 kmReliable
  • Nearest railway station1.14 kmReliable
  • Bus stops within 500 m7Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km24Caveat
  • Nearest lake / water body (≥2 ha)2.08 kmCaveat

Hospitals

  • Nearest hospital0.06 kmCaveat

Schools

  • Schools in pincode 560055 (UDISE+ census)9Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km16Caveat
  • Median pupil-teacher ratio, schools within 1 km16.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)8Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSubramanya Nagar PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well3.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.84 kmReliable
  • Nearest sewage treatment plant0.5 kmCaveat
  • Industrial zones within 1 km20Caveat
  • Nearest airfield runway (any, incl. military)8.06 kmCaveat
  • Nearest commercial-airport runway24.18 kmReliable
  • Distance to runway approach-path proxy19.05 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.01482, 77.55599), 2026-10-24. Each figure's source and caveat are in the full report.