Neighborhood IntelOpen on the map

RERA project · Commercial

Brigade Senate 2

by Brigade Enterprises Ltd · 105 homes · 1.44 acres · 1 tower · Bengaluru North

Delivered late Completed: the builder filed for completion on 13 Nov 2020, 44 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 13 Nov 2020, 44 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
73 homes per acre

Similar projects within 3 km: 37 per acre. 69% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 44 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?35 due so far
0% on time

Of its 55 RERA projects in Bengaluru Urban: 0 delivered on time, 23 late (after the date first promised), 12 past due with no completion filed, 18 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started23 Jun 2017
  2. Approved by RERA19 May 2018
  3. First promised30 Sep 2020

    The date the builder gave at registration.

  4. Completion filed13 Nov 2020

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

COMMERCIAL
990 sq ft
92 m² carpet · sizes 848–2,392 sq ft (16 at this size)
52 m² land share · 21 m² balcony/terrace · 2 parking spaces
105 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Senate 29 floors

Senate 2: 105 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project73
Typical within 3 km (3)37
Typical in the city (76)14

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project69%
Typical within 3 km (3)67%
Typical in the city (76)64%

The share of the land not built on, which includes roads.

Land
1.44 acres

5,844 m²

Ground covered by buildings
31% of the land

1,793 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active commercial projects with a land area on RERA; the comparison is ours.

Who is building it?

All 55 RERA projects of Brigade Group on the map

Complaints to RERA about its other projects

44 complaints across 20 projects. The most complained about:

Show all 20 projects
  • Brigade Buena Vista-Phase 2 2 complaints
  • Brigade Woods 2 complaints
  • Brigade Parkside East 2 complaints
  • Brigade 7 Gardens 2 complaints
  • Brigade Laguna 2 complaints
  • Brigade Parkside North 2 complaints
  • Brigade Northridge Neo 2 complaints
  • Brigade Oasis - Phase 3 2 complaints
  • Brigade Oak Tree Place 2 complaints
  • Brigade Lakefront - Crimson 1 complaint
  • Plumeria Phase 1 at Brigade Meadows 1 complaint
  • Brillio and Commercial at Brigade Valencia 1 complaint
  • Brigade Eternia 1 complaint
  • BRIGADE KOMARLA HEIGHTS 1 complaint
  • Brigade Oasis - Phase 1 1 complaint

The company

Registered as
Brigade Enterprises Ltd
Type
Company
Company number
L85110KA1995PLC019126

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACB7459F

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹48.5 cr
Construction
₹80.0 cr
Total project cost
₹128.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.29 kmReliable
  • Nearest railway station0.74 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital1.26 kmCaveat

Schools

  • Schools in pincode 560094 (UDISE+ census)47Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km10Caveat
  • Median pupil-teacher ratio, schools within 1 km18.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKodigehalli PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km3Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well57.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.29 kmReliable
  • Nearest sewage treatment plant1.06 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)3.61 kmCaveat
  • Nearest commercial-airport runway19.7 kmReliable
  • Distance to runway approach-path proxy14.83 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.04702, 77.58117), 2026-10-24. Each figure's source and caveat are in the full report.