RERA project · Residential/Group Housing
Brigade Insignia
by Brigade Tetrarch Private Limited · 379 homes · 5.88 acres · 6 towers · Bengaluru North
Upcoming Under construction, due Jun 2029. 76% built with 48% of the time used. 100% of homes booked.
At a glance
Due 30 Jun 2029. 48% of the time from RERA approval to the deadline has passed.
472 of 472 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 77 per acre. 53% of the land is left open.
Complaints to RERA about this project. 8 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 55 RERA projects in Bengaluru Urban: 0 delivered on time, 23 late (after the date first promised), 12 past due with no completion filed, 18 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA18 May 2024
- Work started24 May 2024
- Today24 Oct 2026
48% of the time to the deadline has passed.
- Deadline30 Jun 2029
The date it must be complete by.
- If it slips like a typical project1 Apr 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower 1: 66 homes, 3 basements · Tower 2: 66 homes, 3 basements · Tower 3: 80 homes, 3 basements · Tower 4: 81 homes, 3 basements · Tower 5: 66 homes, 4 basements · Tower 6: 113 homes, 3 basements
Amenities
- Electricity
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 5.88 acres
- Ground covered by buildings
- 47% of the land
- Floor-area ratio
- 4.06
- Parking
- 2.20 per home
- Built-up area, all floors
- 12,77,492 sq ft
23,801 m²
11,232 m²
Floors built per unit of land: 4.06 m² of floors for each m² of land.
416 covered, 0 open
1,18,683 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 55 RERA projects of Brigade Group on the map
Complaints to RERA about its other projects
- Gallium at Brigade El Dorado 2 complaints
- Helio at Brigade El Dorado 2 complaints
- Emerald & Luminaire Block at Brigade El Dorado 2 complaints
- Krypton at Brigade Eldorado 1 complaint
- Jasper and Iridium at Brigade El Dorado 1 complaint
The company
- Registered as
- Brigade Tetrarch Private Limited
- Type
- Company
- Company number
- U92412KA1995PTC018247
- PAN
- AAACT7266Q
- GSTIN
- 29AAACT7266Q1ZG
- Website
- www.brigadegroup.com
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
9 registrations under this company
- Cobalt at Brigade El Dorado PRM/KA/RERA/1251/309/PR/160524/006878 · approved 16 May 2024
- Dioro & Beryl at Brigade El Dorado PRM/KA/RERA/1251/309/PR/160224/006634 · approved 16 Feb 2024
- Aurum at Brigade El Dorado PRM/KA/RERA/1250/303/PR/230623/006018 · approved 23 Jun 2023
- Emerald & Luminaire Block at Brigade El Dorado PRM/KA/RERA/1251/309/PR/190722/005089 · approved 19 Jul 2022
- Krypton at Brigade Eldorado PRM/KA/RERA/1251/309/PR/210518/004158 · approved 18 May 2021
- Feldspar at Brigade El Dorado PRM/KA/RERA/1251/309/PR/210216/003909 · approved 16 Feb 2021
- Jasper and Iridium at Brigade El Dorado PRM/KA/RERA/1250/303/PR/200618/003458 · approved 18 Jun 2020
- Helio at Brigade El Dorado PRM/KA/RERA/1251/472/PR/190913/002889 · approved 13 Sep 2019
- Gallium at Brigade El Dorado PRM/KA/RERA/1251/472/PR/190427/002540 · approved 27 Apr 2019
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/180524/006894 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Addl.Dir/JDNORTH/0071/23-24 · 16 May 2024
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBWSSB,Others
Complaints to RERA about this project
- Cancellation of Allotment of the Flat by the Promoter 15 Jul 2026 · Disposed Authority Bench4
Documents
217 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q4 2025-26 | ₹85.6 cr | ₹50.8 cr |
| Q1 2026-27 | ₹84.3 cr | ₹46.6 cr |
| Q2 2026-27 | ₹124.3 cr | ₹58.0 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station11.43 kmReliable
- Nearest railway station1.71 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km5Caveat
- Nearest lake / water body (≥2 ha)1.18 kmCaveat
Hospitals
- Nearest hospital0.48 kmCaveat
Schools
- Schools in pincode 560064 (UDISE+ census)240Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
- Median pupil-teacher ratio, schools within 1 km28.3 :1Caveat
- Schools with library + playground + ICT lab (1 km)7Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionYelahanka PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well16.2 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km3Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)4.32 kmReliable
- Nearest sewage treatment plant0.97 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)2.82 kmCaveat
- Nearest commercial-airport runway12.59 kmReliable
- Distance to runway approach-path proxy7.41 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)1Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat
ReliableFrom our location report at the builder-entered pin (13.11036, 77.60671), 2026-10-24. Each figure's source and caveat are in the full report.