Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

BHOO AABHARANA

by BHOO DEVELOPERS · 116 homes · 1.34 acres · 4 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 30 Apr 2026, 365 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 30 Apr 2026, 365 days after the date it first promised.

How much is sold?0 left
100% booked

116 of 116 homes, as the builder reported for Q1 2026-27.

How crowded is it?More crowded
87 homes per acre

Similar projects within 3 km: 69 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started23 Dec 2022
  2. Approved by RERA14 Sep 2023
  3. First promised30 Apr 2025

    The date the builder gave at registration.

  4. Completion filed30 Apr 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%
Q4 2025-26100%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q1 2026-27

A100%
B100%
C100%
D100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

116 booked0 leftQ1 2026-27

Booked, by type

2 BHK60 of 60
3 BHK56 of 56

Booked, each quarter

Q3 2025-26113 of 116
Q4 2025-26116 of 116
Q1 2026-27116 of 116

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
995 sq ft
92 m² carpet · sizes 856–1,028 sq ft (12 at this size)
41 m² land share · 1 parking space
60 homes · 52% of the project
3 BHK
1,260 sq ft
117 m² carpet · sizes 1,093–1,403 sq ft (8 at this size)
54 m² land share · 1 parking space
56 homes · 48% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A3 floors
B3 floors
C3 floors
D3 floors

A: 28 homes, 13 m tall, 1 basement · B: 28 homes, 13 m tall, 1 basement · C: 24 homes, 13 m tall, 1 basement · D: 36 homes, 13 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project87
Typical within 3 km (72)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (74)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.34 acres

5,416 m²

Ground covered by buildings
50% of the land

2,708 m²

Floor-area ratio
2.37

Floors built per unit of land: 2.37 m² of floors for each m² of land.

Parking
1.13 per home

131 covered, 0 open

Built-up area, all floors
1,92,588 sq ft

17,892 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of BHOO DEVELOPERS on the map

The company

Registered as
BHOO DEVELOPERS
Type
Partnership Firm
PAN
AATFB8946R
GSTIN
29AATFB8946R1Z2

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹11.5 crBuilding and development ₹75.1 crTotal ₹86.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹9.8 cr₹4.4 cr
Q4 2025-26₹9.8 cr₹4.4 cr
Q1 2026-27₹9.8 cr₹4.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.11 kmReliable
  • Nearest railway station5.64 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.67 kmCaveat

Hospitals

  • Nearest hospital1.56 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km17.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.81 kmReliable
  • Nearest sewage treatment plant2.06 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)6.99 kmCaveat
  • Nearest commercial-airport runway14.3 kmReliable
  • Distance to runway approach-path proxy13.11 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.06283, 77.66408), 2026-10-24. Each figure's source and caveat are in the full report.