Upcoming Under construction, due Jun 2031. 1% built with 5% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
1% built

Due 2 Jun 2031. 5% of the time from RERA approval to the deadline has passed.

Built1%
Time used5%
How much is sold?206 left
0% booked

0 of 206 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
67 homes per acre

Similar projects within 3 km: 69 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started5 Jul 2026
  2. Approved by RERA24 Jul 2026
  3. Today24 Oct 2026

    5% of the time to the deadline has passed.

  4. If it slips like a typical project3 Mar 2032

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q2 2026-271%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A1%
Block B1%
Block C5%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked206 leftQ2 2026-27

Still available: 70 × 2 BHK, 75 × 3 BHK-2T, 61 × 3 BHK-3T.

Booked, by type

2 BHK0 of 70
3 BHK-2T0 of 75
3 BHK-3T0 of 61

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK-2T
844 sq ft
78 m² carpet · sizes 700–891 sq ft (25 at this size)
57 m² land share · 17 m² balcony/terrace · 1 parking space
75 homes · 36% of the project
2 BHK
700 sq ft
65 m² carpet · sizes 695–844 sq ft (37 at this size)
45 m² land share · 12 m² balcony/terrace · 1 parking space
70 homes · 34% of the project
3 BHK-3T
971 sq ft
90 m² carpet · sizes 945–1,018 sq ft (16 at this size)
64 m² land share · 19 m² balcony/terrace · 1 parking space
61 homes · 30% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A5 floors
Block B5 floors
Block C6 floors

Block A: 75 homes, 18 m tall · Block B: 45 homes, 18 m tall · Block C: 86 homes, 21 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project67
Typical within 3 km (86)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (86)61%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.07 acres

12,444 m²

Ground covered by buildings
50% of the land

6,224 m²

Floor-area ratio
1.99

Floors built per unit of land: 1.99 m² of floors for each m² of land.

Parking
1.27 per home

212 covered, 49 open

Built-up area, all floors
3,30,828 sq ft

30,735 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Bhavya Constructions on the map

The company

Registered as
Bhavya Constructions
Type
Partnership Firm
PAN
AAUFB8904E
GSTIN
29AAUFB8904E1Z2

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹34.4 crBuilding and development ₹186.2 crTotal ₹220.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.59 kmReliable
  • Nearest railway station3.1 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km7Caveat
  • Nearest lake / water body (≥2 ha)0.74 kmCaveat

Hospitals

  • Nearest hospital0.2 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km24.8 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.39 kmReliable
  • Nearest sewage treatment plant0.7 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)4.72 kmCaveat
  • Nearest commercial-airport runway31.17 kmReliable
  • Distance to runway approach-path proxy30.27 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.90803, 77.67728), 2026-10-24. Each figure's source and caveat are in the full report.