Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

BELVEDERE BY UKN AIRPORT DISTRICT -PHASE 2

by U.K.N. PROPERTIES PRIVATE LIMITED · 595 homes · 4.58 acres · 6 towers · Bengaluru North

Upcoming Under construction, due Feb 2031. 51% built with 38% of the time used. 54% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
51% built

Due 28 Feb 2031. 38% of the time from RERA approval to the deadline has passed.

Built51%
Time used38%
How much is sold?276 left
54% booked

328 of 604 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
130 homes per acre

Similar projects within 3 km: 61 per acre. 77% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Mar 2024
  2. Approved by RERA6 Mar 2024
  3. Today24 Oct 2026

    38% of the time to the deadline has passed.

  4. If it slips like a typical project30 Nov 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2635%
Q4 2025-2641%
Q1 2026-2743%
Q2 2026-2751%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A40%
B50%
E55%
F55%
G35%
H50%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

328 booked276 leftQ2 2026-27

Still available: 60 × 1 BHK, 64 × 2 BHK, 9 × COMMERCIAL, 143 × 3 BHK.

Booked, by type

1 BHK54 of 114
2 BHK149 of 213
COMMERCIAL0 of 9
3 BHK125 of 268

Booked, each quarter

Q3 2025-26316 of 604
Q4 2025-26326 of 604
Q1 2026-27327 of 604
Q2 2026-27328 of 604

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,121 sq ft
104 m² carpet · sizes 767–1,334 sq ft (134 at this size)
31 m² land share · 40 m² balcony/terrace · 1 parking space
268 homes · 44% of the project
2 BHK
767 sq ft
71 m² carpet · sizes 672–926 sq ft (132 at this size)
22 m² land share · 31 m² balcony/terrace · 1 parking space
213 homes · 35% of the project
1 BHK
469 sq ft
44 m² carpet · sizes 469–563 sq ft (111 at this size)
13 m² land share · 18 m² balcony/terrace · 1 parking space
114 homes · 19% of the project
COMMERCIAL
5,907 sq ft
549 m² carpet · sizes 2,836–5,907 sq ft (5 at this size)
155 m² land share · 165 m² balcony/terrace · 8 parking spaces
9 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A16 floors
B4 floors
E16 floors
F16 floors
G16 floors
H16 floors

A: 175 homes, 50 m tall, 2 basements · B: 5 homes, 15 m tall, 2 basements · E: 102 homes, 50 m tall, 2 basements · F: 136 homes, 50 m tall, 2 basements · G: 118 homes, 50 m tall, 2 basements · H: 68 homes, 50 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project130
Typical within 3 km (14)61
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project77%
Typical within 3 km (14)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.58 acres

18,543 m²

Ground covered by buildings
23% of the land

4,227 m²

Floor-area ratio
2.49

Floors built per unit of land: 2.49 m² of floors for each m² of land.

Parking
1.14 per home

595 covered, 85 open

Built-up area, all floors
8,44,966 sq ft

78,500 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of U.K.N. PROPERTIES PRIVATE LIMITED on the map

Complaints to RERA about its other projects

The company

Registered as
U.K.N. PROPERTIES PRIVATE LIMITED
Type
Company
PAN
AAACU3584A

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.7 crBuilding and development ₹330.3 crTotal ₹333.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹10.7 cr₹11.4 cr
Q4 2025-26₹11.0 cr₹11.1 cr
Q1 2026-27₹6.5 cr₹7.6 cr
Q2 2026-27₹9.3 cr₹8.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station22.32 kmReliable
  • Nearest railway station3.67 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.7 kmCaveat

Hospitals

  • Nearest hospital4.74 kmCaveat

Schools

  • Schools in pincode 562110 (UDISE+ census)3Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.15 kmReliable
  • Nearest sewage treatment plant6.34 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)4.69 kmCaveat
  • Nearest commercial-airport runway4.69 kmReliable
  • Distance to runway approach-path proxy0 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.20379, 77.64307), 2026-10-24. Each figure's source and caveat are in the full report.