RERA project · Residential/Group Housing

Azur Tower D

by Lodha Developers Limited · 112 homes · 0.40 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Apr 2030. 31% built with 42% of the time used. 93% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
31% built

Due 30 Apr 2030. 42% of the time from RERA approval to the deadline has passed.

Built31%
Time used42%
How much is sold?8 left
93% booked

110 of 118 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
282 homes per acre

Similar projects within 3 km: 75 per acre. 44% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?Too early to tell
No deliveries yet

None of its 7 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA28 Mar 2024
  2. Work started2 Jan 2025
  3. Today24 Oct 2026

    42% of the time to the deadline has passed.

  4. If it slips like a typical project30 Jan 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-264%
Q4 2025-2616%
Q1 2026-2718%
Q2 2026-2731%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

110 booked8 leftQ2 2026-27

Still available: 1 × 2 BHK, 2 × 2.5 BHK, 2 × 3 BHK, 2 × 3.5 BHK, 1 × 3.5 BHK WITH PRIVATE GARDEN.

Booked, by type

2 BHK1 of 2
2.5 BHK0 of 2
3 BHK22 of 24
3.5 BHK23 of 25
3.5 BHK WITH PRIVATE GARDEN0 of 1
4 BHK54 of 54
4 BHK JODI-TYPE 21 of 1
4 BHK JODI-TYPE 2A3 of 3
4 BHK WITH PRIVATE GARDEN2 of 2
5 BHK JODI-TYPE 31 of 1
5 BHK JODI-TYPE 3A3 of 3

Booked, each quarter

Q3 2025-2698 of 118
Q4 2025-26103 of 118
Q1 2026-27105 of 118
Q2 2026-27110 of 118

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
  • 1,699 sq ft54 homes157.8 m²
Typically 8 m² land share · 1 parking space
54 homes · 46% of the project
3.5 BHK
  • 1,348 sq ft25 homes125.2 m²
Typically 6 m² land share · 1 parking space
25 homes · 21% of the project
3 BHK
  • 1,156 sq ft24 homes107.4 m²
Typically 5 m² land share · 1 parking space
24 homes · 20% of the project
4 BHK JODI-TYPE 2A
  • 2,559 sq ft3 homes237.7 m²
Typically 11 m² land share · 1 parking space
3 homes · 3% of the project
5 BHK JODI-TYPE 3A
  • 3,468 sq ft3 homes322.2 m²
Typically 15 m² land share · 1 parking space
3 homes · 3% of the project
4 BHK WITH PRIVATE GARDEN
  • 1,699 sq ft2 homes157.8 m²
Typically 11 m² land share · 1 parking space
2 homes · 2% of the project
2.5 BHK
  • 1,116 sq ft2 homes103.7 m²
Typically 5 m² land share · 1 parking space
2 homes · 2% of the project
2 BHK
  • 921 sq ft2 homes85.6 m²
Typically 4 m² land share · 1 parking space
2 homes · 2% of the project
3.5 BHK WITH PRIVATE GARDEN
  • 1,348 sq ft1 home125.2 m²
Typically 8 m² land share · 1 parking space
1 home · 1% of the project
4 BHK JODI-TYPE 2
  • 3,058 sq ft1 home284.1 m²
Typically 16 m² land share · 1 parking space
1 home · 1% of the project
5 BHK JODI-TYPE 3
  • 4,003 sq ft1 home371.9 m²
Typically 23 m² land share · 1 parking space
1 home · 1% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-D33 floors

Tower-D: 118 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project282
Typical within 3 km (71)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project44%
Typical within 3 km (72)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.40 acres

1,607 m²

Ground covered by buildings
56% of the land

899 m²

Floor-area ratio
2.49

Floors built per unit of land: 2.49 m² of floors for each m² of land.

Parking
10.32 per home

1,156 covered, 0 open

Built-up area, all floors
2,59,410 sq ft

24,100 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 7 RERA projects of Lodha on the map

Complaints to RERA about its other projects

The company

Registered as
Lodha Developers Limited
Type
Company
Company number
U45200MH1995PLC093041

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACL1490J
GSTIN
29AAACL1490J1ZC

Its other registrations on RERA Karnataka

6 registrations under this company
  • Fiorana@Beaumont Estate(Phase-1) PRM/KA/RERA/1251/472/PR/200726/008829 · approved 20 Jul 2026
  • Haven Phase 2 PRM/KA/RERA/1251/308/PR/260326/008551 · approved 26 Mar 2026
  • Elanza PRM/KA/RERA/1251/308/PR/191225/008353 · approved 19 Dec 2025
  • Azur Phase 2 PRM/KA/RERA/1251/310/PR/200925/008110 · approved 20 Sep 2025
  • Haven PRM/KA/RERA/1251/308/PR/280525/007785 · approved 28 May 2025
  • Azur PRM/KA/RERA/1251/310/PR/220324/006728 · approved 22 Mar 2024

The land is owned together with others (a joint development), including M/s. Suadela Constructions Pvt. Ltd..

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.7 crBuilding and development ₹131.6 crTotal ₹134.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹99.8 cr₹47.7 cr
Q4 2025-26₹145.0 cr₹59.0 cr
Q1 2026-27₹165.8 cr₹74.8 cr
Q2 2026-27₹275.8 cr₹161.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.9 kmReliable
  • Nearest railway station11.28 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km12Caveat
  • Nearest lake / water body (≥2 ha)0.44 kmCaveat

Hospitals

  • Nearest hospital1.2 kmCaveat

Schools

  • Schools in pincode 560076 (UDISE+ census)85Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km24.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionHulimavu PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.56 kmReliable
  • Nearest sewage treatment plant0.87 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.83 kmCaveat
  • Nearest commercial-airport runway36.2 kmReliable
  • Distance to runway approach-path proxy33.67 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.87220, 77.60818), 2026-10-24. Each figure's source and caveat are in the full report.