Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Assetz Sora & Saki Phase 2

by NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITED · 634 homes · 2.45 acres · 3 towers · Bengaluru North

Upcoming Under construction, due Jul 2029. 29% built with 47% of the time used. 38% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
29% built

Due 31 Jul 2029. 47% of the time from RERA approval to the deadline has passed.

Built29%
Time used47%
How much is sold?392 left
38% booked

242 of 634 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
259 homes per acre

Similar projects within 3 km: 117 per acre. 56% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 May 2024
  2. Approved by RERA21 May 2024
  3. Today24 Oct 2026

    47% of the time to the deadline has passed.

  4. If it slips like a typical project2 May 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2620%
Q4 2025-2624%
Q1 2026-2726%
Q2 2026-2729%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing A378%
Wing A48%
Wing A512%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

242 booked392 leftQ2 2026-27

Still available: 129 × 2 BHK, 134 × 3 BHK, 129 × Studio.

Booked, by type

2 BHK77 of 206
3 BHK88 of 222
Studio77 of 206

Booked, each quarter

Q3 2025-26184 of 634
Q4 2025-26208 of 634
Q1 2026-27224 of 634
Q2 2026-27242 of 634

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,139 sq ft
106 m² carpet · sizes 1,139–1,182 sq ft (178 at this size)
39 m² land share · 1 parking space
222 homes · 35% of the project
Studio
174 sq ft
16 m² carpet
6 m² land share · 1 parking space
206 homes · 32% of the project
2 BHK
996 sq ft
92 m² carpet
36 m² land share · 1 parking space
206 homes · 32% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing A318 floors
Wing A418 floors
Wing A518 floors

Wing A3: 205 homes, 58 m tall, 1 basement · Wing A4: 215 homes, 58 m tall, 1 basement · Wing A5: 214 homes, 58 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project259
Typical within 3 km (24)117
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project56%
Typical within 3 km (24)79%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.45 acres

9,917 m²

Ground covered by buildings
44% of the land

4,329 m²

Floor-area ratio
3.24

Floors built per unit of land: 3.24 m² of floors for each m² of land.

Parking
0.94 per home

433 covered, 164 open

Built-up area, all floors
8,86,030 sq ft

82,315 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

The company

Registered as
NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITED
Type
Company
Company number
U72200KA2004PTC033597

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCN7046D
GSTIN
29AADCN7046D1ZG
Website
www.assetzproperty.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.9 crBuilding and development ₹292.1 crTotal ₹308.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹19.8 cr₹10.2 cr
Q4 2025-26₹25.0 cr₹18.8 cr
Q1 2026-27₹32.3 cr₹20.8 cr
Q2 2026-27₹18.4 cr₹12.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station16.35 kmReliable
  • Nearest railway station6.97 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.38 kmCaveat

Hospitals

  • Nearest hospital1.03 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.47 kmReliable
  • Nearest sewage treatment plant3.21 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)4.74 kmCaveat
  • Nearest commercial-airport runway4.74 kmReliable
  • Distance to runway approach-path proxy3.99 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.14778, 77.68080), 2026-10-24. Each figure's source and caveat are in the full report.