Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ASSETZ SORA & SAKI Phase 1

by NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITED · 358 homes · 5.83 acres · 2 towers · Bengaluru North

Upcoming Under construction, due Sep 2028. 80% built with 58% of the time used. 88% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
80% built

Due 30 Sep 2028. 58% of the time from RERA approval to the deadline has passed.

Built80%
Time used58%
How much is sold?44 left
88% booked

314 of 358 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
61 homes per acre

Similar projects within 3 km: 119 per acre. 88% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA6 Mar 2024
  2. Work started1 Apr 2024
  3. Today24 Oct 2026

    58% of the time to the deadline has passed.

  4. If it slips like a typical project2 Jul 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2650%
Q4 2025-2669%
Q1 2026-2772%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing A-1100%
Wing A-2100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

314 booked44 leftQ2 2026-27

Still available: 11 × 2 BHK, 22 × 3 BHK, 11 × Studio.

Booked, by type

2 BHK61 of 72
3 BHK192 of 214
Studio61 of 72

Booked, each quarter

Q3 2025-26313 of 358
Q4 2025-26315 of 358
Q1 2026-27313 of 358
Q2 2026-27314 of 358

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,139 sq ft106 homes105.8 m²
  • 1,182 sq ft72 homes109.8 m²
  • 1,140 sq ft36 homes105.9 m²
Typically 39 m² land share · 1 parking space
214 homes · 60% of the project
Studio
  • 174 sq ft72 homes16.2 m²
Typically 6 m² land share
72 homes · 20% of the project
2 BHK
  • 996 sq ft72 homes92.5 m²
Typically 36 m² land share · 1 parking space
72 homes · 20% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing A-118 floors
Wing A-218 floors

Wing A-1: 179 homes, 58 m tall, 1 basement · Wing A-2: 179 homes, 58 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project61
Typical within 3 km (24)119
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (24)77%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.83 acres

23,598 m²

Ground covered by buildings
12% of the land

2,886 m²

Floor-area ratio
3.24

Floors built per unit of land: 3.24 m² of floors for each m² of land.

Parking
0.99 per home

322 covered, 33 open

Built-up area, all floors
5,90,325 sq ft

54,843 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

The company

Registered as
NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITED
Type
Company
Company number
U72200KA2004PTC033597

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCN7046D
GSTIN
29AADCN7046D1ZG
Website
www.assetzproperty.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹37.8 crBuilding and development ₹226.1 crTotal ₹263.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹24.9 cr₹19.2 cr
Q4 2025-26₹45.3 cr₹28.9 cr
Q1 2026-27₹34.9 cr₹22.5 cr
Q2 2026-27₹18.6 cr₹13.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station16.35 kmReliable
  • Nearest railway station6.97 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.38 kmCaveat

Hospitals

  • Nearest hospital1.03 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.47 kmReliable
  • Nearest sewage treatment plant3.21 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)4.74 kmCaveat
  • Nearest commercial-airport runway4.74 kmReliable
  • Distance to runway approach-path proxy3.99 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.14778, 77.68080), 2026-10-24. Each figure's source and caveat are in the full report.