RERA project · Residential/Group Housing
Assetz Mizumi Reserve Tower A3 A5
by APG COMMUNITY DEVELOPMENT PRIVATE LIMITED · 264 homes · 1.85 acres · 2 towers · Anekal
Upcoming Under construction, due Mar 2031. 59% built with 9% of the time used. 6% of homes booked.
At a glance
Due 31 Mar 2031. 9% of the time from RERA approval to the deadline has passed.
15 of 264 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 71 per acre. 68% of the land is left open.
Complaints to RERA about this project.
The builder declares litigation on the land or the project.
Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Apr 2026
- Approved by RERA13 May 2026
- Today24 Oct 2026
9% of the time to the deadline has passed.
- Deadline31 Mar 2031
The date it must be complete by.
- If it slips like a typical project31 Dec 2031
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 1 × 2 BHK, 174 × 3 BHK, 74 × 4 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
- 1,427 sq ft88 homes132.6 m²
- 1,305 sq ft86 homes121.2 m²
- 1,453 sq ft2 homes135.0 m²
- 1,681 sq ft86 homes156.2 m²
- 967 sq ft2 homes89.8 m²
Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower 3: 176 homes, 72 m tall, 2 basements · Tower 5: 88 homes, 72 m tall, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.85 acres
- Ground covered by buildings
- 32% of the land
- Floor-area ratio
- 0.52
- Parking
- 1.44 per home
- Built-up area, all floors
- 5,58,216 sq ft
7,494 m²
2,403 m²
Floors built per unit of land: 0.52 m² of floors for each m² of land.
345 covered, 36 open
51,860 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 54 RERA projects of Assetz on the map
The company
- Registered as
- APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
- Type
- Company
- Company number
- U45203KA2014PTC077653
- PAN
- AANCA1479M
- GSTIN
- 29AANCA1479M1ZZ
- Website
- www.assetzproperty.com
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Assetz Mizumi Reserve Tower A1 A2 A4 PRM/KA/RERA/1251/310/PR/040226/008450 · approved 4 Feb 2026
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/130526/008650 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/CC/22720/25-26 · 7 Apr 2026
- Litigation on the landDeclared by the builder
- Litigation on the projectDeclared in the Q2 2026-27 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
342 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q1 2026-27 | ₹20.5 lakh | ₹13.7 lakh |
| Q2 2026-27 | ₹5.5 cr | ₹0.0 lakh |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station1.3 kmReliable
- Nearest railway station5.94 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km2Caveat
- Parks within 1 km5Caveat
- Nearest lake / water body (≥2 ha)0.74 kmCaveat
Hospitals
- Nearest hospital0.53 kmCaveat
Schools
- Schools in pincode 560068 (UDISE+ census)144Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km10Caveat
- Median pupil-teacher ratio, schools within 1 km24.6 :1Caveat
- Schools with library + playground + ICT lab (1 km)7Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionparappana AgraharaReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km2Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well1 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)1.4 kmReliable
- Nearest sewage treatment plant1.22 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)7.03 kmCaveat
- Nearest commercial-airport runway33.86 kmReliable
- Distance to runway approach-path proxy32.51 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.88520, 77.65600), 2026-10-24. Each figure's source and caveat are in the full report.