RERA project · Residential/Group Housing

Assetz Meru & Meadow

by GOKULAM SHELTERS PRIVATE LIMITED · 520 homes · 5.66 acres · 2 towers · Bengaluru South

Upcoming Under construction, due Nov 2030. 20% built with 25% of the time used. 84% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
20% built

Due 30 Nov 2030. 25% of the time from RERA approval to the deadline has passed.

Built20%
Time used25%
How much is sold?84 left
84% booked

436 of 520 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
92 homes per acre

Similar projects within 3 km: 77 per acre. 86% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jun 2025
  2. Approved by RERA13 Jun 2025
  3. Today24 Oct 2026

    25% of the time to the deadline has passed.

  4. If it slips like a typical project1 Sep 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-265%
Q4 2025-2610%
Q1 2026-2714%
Q2 2026-2720%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 68%
Tower 76%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

436 booked84 leftQ2 2026-27

Still available: 2 × 1 BHK, 16 × 2 BHK, 49 × 3 BHK, 1 × 4 BHK, 16 × E W S.

Booked, by type

1 BHK2 of 4
2 BHK36 of 52
3 BHK351 of 400
4 BHK11 of 12
E W S36 of 52

Booked, each quarter

Q3 2025-26300 of 520
Q4 2025-26364 of 520
Q1 2026-27385 of 520
Q2 2026-27436 of 520

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,300 sq ft
121 m² carpet · sizes 1,297–1,428 sq ft (170 at this size)
39 m² land share · 1 parking space
400 homes · 77% of the project
E W S
260 sq ft
24 m² carpet
8 m² land share
52 homes · 10% of the project
2 BHK
1,100 sq ft
102 m² carpet
34 m² land share · 1 parking space
52 homes · 10% of the project
4 BHK
1,996 sq ft
185 m² carpet · sizes 1,996–2,100 sq ft (4 at this size)
66 m² land share · 27 m² balcony/terrace · 1 parking space
12 homes · 2% of the project
1 BHK
433 sq ft
40 m² carpet
12 m² land share
4 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 630 floors
Tower 730 floors

Tower 6: 260 homes, 98 m tall, 2 basements · Tower 7: 260 homes, 98 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project92
Typical within 3 km (62)77
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project86%
Typical within 3 km (62)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.66 acres

22,921 m²

Ground covered by buildings
13% of the land

3,086 m²

Floor-area ratio
82447.00

Floors built per unit of land: 82447.00 m² of floors for each m² of land.

Parking
1.21 per home

574 covered, 56 open

Built-up area, all floors
11,72,512 sq ft

1,08,930 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

The company

Registered as
GOKULAM SHELTERS PRIVATE LIMITED
Type
Company
PAN
AADCG6505C
GSTIN
29AADCG6505C1ZV
Website
www.assetzproperty.com

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹155.5 crBuilding and development ₹560.5 crTotal ₹716.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹97.0 cr₹5.0 cr
Q4 2025-26₹108.8 cr₹75.8 cr
Q1 2026-27₹205.1 cr₹90.0 cr
Q2 2026-27₹364.6 cr₹169.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.3 kmReliable
  • Nearest railway station6.91 kmReliable
  • Bus stops within 500 m6Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.1 kmCaveat

Hospitals

  • Nearest hospital0.54 kmCaveat

Schools

  • Schools in pincode 560062 (UDISE+ census)66Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km16Caveat
  • Median pupil-teacher ratio, schools within 1 km19.9 :1Caveat
  • Schools with library + playground + ICT lab (1 km)10Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSubramanyapura PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)29 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well8.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.93 kmReliable
  • Nearest sewage treatment plant2.55 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)12.88 kmCaveat
  • Nearest commercial-airport runway36.57 kmReliable
  • Distance to runway approach-path proxy32.71 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.88730, 77.55330), 2026-10-24. Each figure's source and caveat are in the full report.