Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Assetz Marq Phase 3B

by Assetz Whitefield Homes Private Limited · 384 homes · 2.64 acres · 1 tower · Bengaluru East

Delivered on time Completed: the builder filed for completion on 24 Jul 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 24 Jul 2026, by the date it promised.

How much is sold?1 left
100% booked

383 of 384 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
146 homes per acre

Similar projects within 3 km: 79 per acre. 49% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 6 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jul 2022
  2. Approved by RERA9 Nov 2022
  3. Completion filed24 Jul 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2694%
Q4 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

383 booked1 leftQ4 2025-26

Still available: 1 × 1 BHK.

Booked, by type

1 BHK1 of 2
3 BHK326 of 326
4 BHK8 of 8
STUDIO48 of 48

Booked, each quarter

Q3 2025-26383 of 384
Q4 2025-26383 of 384

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,196 sq ft56 homes111.1 m²
  • 1,357 sq ft48 homes126.1 m²
  • 1,049 sq ft28 homes97.5 m²
  • 1,069 sq ft28 homes99.3 m²
  • and 166 homes in other sizes
Typically 44 m² land share · 11 m² balcony/terrace · 1 parking space
326 homes · 85% of the project
STUDIO
  • 213 sq ft48 homes19.8 m²
Typically 8 m² land share
48 homes · 12% of the project
4 BHK
  • 1,570 sq ft4 homes145.9 m²
  • 1,580 sq ft4 homes146.8 m²
Typically 61 m² land share · 2 parking spaces
8 homes · 2% of the project
1 BHK
  • 550 sq ft1 home51.1 m²
  • 555 sq ft1 home51.6 m²
Typically 20 m² land share · 1 parking space
2 homes · 1% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Marq Phase 3B29 floors

Marq Phase 3B: 384 homes, 91 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project146
Typical within 3 km (65)79
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project49%
Typical within 3 km (64)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.64 acres

10,680 m²

Ground covered by buildings
51% of the land

5,484 m²

Floor-area ratio
2.97

Floors built per unit of land: 2.97 m² of floors for each m² of land.

Parking
1.12 per home

397 covered, 34 open

Built-up area, all floors
5,50,057 sq ft

51,102 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

Complaints to RERA about its other projects

The company

Registered as
Assetz Whitefield Homes Private Limited
Type
Company
Company number
U70109KA2012PTC063873

CIN or LLPIN, from the Registrar of Companies.

PAN
AAKCA7816P
GSTIN
29AAKCA7816P1ZV
Website
www.assetzproperty.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including Sai Lakshmi Industries Pvt Ltd.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹37.4 crBuilding and development ₹227.5 crTotal ₹264.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹9.3 cr₹6.2 cr
Q4 2025-26₹74.5 lakh₹49.8 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.25 kmReliable
  • Nearest railway station3.15 kmReliable
  • Bus stops within 500 m5Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km13Caveat
  • Nearest lake / water body (≥2 ha)0.78 kmCaveat

Hospitals

  • Nearest hospital0.73 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.23 kmReliable
  • Nearest sewage treatment plant1.66 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)5.71 kmCaveat
  • Nearest commercial-airport runway18.59 kmReliable
  • Distance to runway approach-path proxy17.02 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.02483, 77.76258), 2026-10-24. Each figure's source and caveat are in the full report.