Upcoming Under construction, due Sep 2031. 2% built with 5% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
2% built

Due 30 Sep 2031. 5% of the time from RERA approval to the deadline has passed.

Built2%
Time used5%
How much is sold?845 left
0% booked

0 of 845 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
149 homes per acre

Similar projects within 3 km: 117 per acre. 62% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA22 Jul 2026
  2. Work started15 Sep 2026
  3. Today24 Oct 2026

    5% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jul 2032

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q2 2026-272%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A0%
Tower B0%
Tower C0%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked845 leftQ2 2026-27

Still available: 5 × 1BHK, 339 × 3BHK2T, 163 × 3BHK3T, 169 × 2BHK2T, 169 × EWS.

Booked, by type

1BHK0 of 5
3BHK2T0 of 339
3BHK3T0 of 163
2BHK2T0 of 169
EWS0 of 169

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK2T
998 sq ft
93 m² carpet · sizes 936–998 sq ft (227 at this size)
25 m² land share · 8 m² balcony/terrace · 1 parking space
339 homes · 40% of the project
2BHK2T
936 sq ft
87 m² carpet · sizes 936–998 sq ft (168 at this size)
25 m² land share · 13 m² balcony/terrace · 1 parking space
169 homes · 20% of the project
EWS
184 sq ft
17 m² carpet
5 m² land share · 1 parking space
169 homes · 20% of the project
3BHK3T
1,131 sq ft
105 m² carpet · sizes 1,101–1,131 sq ft (55 at this size)
29 m² land share · 13 m² balcony/terrace · 1 parking space
163 homes · 19% of the project
1BHK
421 sq ft
39 m² carpet · sizes 390–421 sq ft (4 at this size)
10 m² land share · 1 parking space
5 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A28 floors
Tower B29 floors
Tower C29 floors

Tower A: 220 homes, 89 m tall, 2 basements · Tower B: 312 homes, 92 m tall, 2 basements · Tower C: 313 homes, 92 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project149
Typical within 3 km (24)117
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project62%
Typical within 3 km (24)79%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.67 acres

22,946 m²

Ground covered by buildings
38% of the land

8,630 m²

Floor-area ratio
4.20

Floors built per unit of land: 4.20 m² of floors for each m² of land.

Parking
1.02 per home

775 covered, 85 open

Built-up area, all floors
14,40,630 sq ft

1,33,839 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

The company

Registered as
Elite Projects
Type
Partnership Firm
PAN
AALFE6056H
GSTIN
29AALFE6056H1Z3
Website
www.assetzproperty.com

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹36.7 crBuilding and development ₹713.1 crTotal ₹749.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q2 2026-27₹4.0 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station16.3 kmReliable
  • Nearest railway station7.01 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.56 kmCaveat

Hospitals

  • Nearest hospital0.8 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.29 kmReliable
  • Nearest sewage treatment plant3.45 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)4.85 kmCaveat
  • Nearest commercial-airport runway4.85 kmReliable
  • Distance to runway approach-path proxy4.01 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.14732, 77.67851), 2026-10-24. Each figure's source and caveat are in the full report.