RERA project · Residential/Group Housing

Assetz 22 & Crest

by BHAIRAV HOLDINGS INC · 197 homes · 1.80 acres · 2 towers · Bengaluru North

Upcoming Under construction, due Dec 2026, after an extension. 0% built with 96% of the time used. 60% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
0% built

Due 31 Dec 2026. 96% of the time from RERA approval to the deadline has passed.

Built0%
Time used96%
How much is sold?79 left
60% booked

118 of 197 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
110 homes per acre

Similar projects within 3 km: 70 per acre. 79% of the land is left open.

Any complaints?See the list
4 complaints

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?28 due so far
25% on time

Of its 54 RERA projects in Bengaluru Urban: 7 delivered on time, 11 late (after the date first promised), 10 past due with no completion filed, 26 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started30 Oct 2016
  2. First promised30 Mar 2022

    The date the builder gave at registration.

  3. Approved by RERA2 Aug 2022
  4. Today24 Oct 2026

    96% of the time to the deadline has passed.

  5. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2671%
Q4 2025-2674%
Q1 2026-2782%
Q2 2026-270%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A100%
Tower B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

118 booked79 leftQ2 2026-27

Still available: 1 × 2 BHK, 17 × 3 BHK, 1 × 2BHK, 60 × 3BHK.

Booked, by type

2 BHK0 of 1
3 BHK69 of 86
2BHK0 of 1
3BHK49 of 109

Booked, each quarter

Q3 2025-2687 of 197
Q4 2025-2696 of 197
Q1 2026-2797 of 197
Q2 2026-27118 of 197

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
953 sq ft
88 m² carpet · sizes 953–1,193 sq ft (23 at this size)
35 m² land share · 2 m² balcony/terrace · 1 parking space
109 homes · 55% of the project
3 BHK
1,060 sq ft
98 m² carpet · sizes 1,034–1,262 sq ft (23 at this size)
41 m² land share · 2 m² balcony/terrace · 1 parking space
86 homes · 44% of the project
2 BHK
926 sq ft
86 m² carpet
33 m² land share · 1 parking space
1 home · 1% of the project
2BHK
966 sq ft
90 m² carpet
35 m² land share · 1 parking space
1 home · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A22 floors
Tower B22 floors

Tower A: 87 homes, 2 basements · Tower B: 110 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project110
Typical within 3 km (25)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project79%
Typical within 3 km (27)40%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.80 acres

7,275 m²

Ground covered by buildings
21% of the land

1,523 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 54 RERA projects of Assetz on the map

The company

Registered as
BHAIRAV HOLDINGS INC
Type
Partnership Firm
PAN
AAKFB6935F

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹43.1 cr
Construction
₹72.7 cr
Total project cost
₹115.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹26.9 cr₹12.6 cr
Q4 2025-26₹25.1 cr₹16.7 cr
Q1 2026-27₹15.8 cr₹10.5 cr
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.49 kmReliable
  • Nearest railway station0.74 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km15Caveat
  • Nearest lake / water body (≥2 ha)1.94 kmCaveat

Hospitals

  • Nearest hospital0.6 kmCaveat

Schools

  • Schools in pincode 560022 (UDISE+ census)48Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km19Caveat
  • Median pupil-teacher ratio, schools within 1 km17 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYeshwanthpura RMC Yard PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well3.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.51 kmReliable
  • Nearest sewage treatment plant0.19 kmCaveat
  • Industrial zones within 1 km20Caveat
  • Nearest airfield runway (any, incl. military)8.21 kmCaveat
  • Nearest commercial-airport runway24.36 kmReliable
  • Distance to runway approach-path proxy19.03 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.01713, 77.55024), 2026-10-24. Each figure's source and caveat are in the full report.