RERA project · Residential/Group Housing
ASPIRE AMBER
by SUMADHURA HOMES LLP · 216 homes · 2.03 acres · 3 towers · Bengaluru East
Delivered late Completed: the builder filed for completion on 6 Jan 2025, 6 days after the date it first promised.
At a glance
The builder filed for completion on 6 Jan 2025, 6 days after the date it first promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 80 per acre. 62% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started1 Dec 2021
- Approved by RERA25 Feb 2022
- Completion filed6 Jan 2025
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Wing-A: 90 homes, 24 m tall, 1 basement · Wing-B: 63 homes, 24 m tall, 1 basement · Wing-C: 63 homes, 24 m tall, 1 basement
Amenities
- Electricity 45 m²
- CCTV Surveillance 24 m²
- Club House 440 m²
- Community Hall 94 m²
- Outdoor Sports facility 1,388 m²
- Indoor Sports facility 49 m²
- Swimming Pool 204 m²
- Gym 66 m²
- Parks 708 m²
- Power Backup 43 m²
- Water and Sanitation 375 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.03 acres
- Ground covered by buildings
- 38% of the land
- Floor-area ratio
- 18100.00
- Parking
- 1.10 per home
- Built-up area, all floors
- 2,91,271 sq ft
8,195 m²
3,076 m²
Floors built per unit of land: 18100.00 m² of floors for each m² of land.
219 covered, 19 open
27,060 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 27 RERA projects of Sumadhura on the map
The company
- Registered as
- SUMADHURA HOMES LLP
- Type
- Partnership Firm
- PAN
- AEAFS4090N
- GSTIN
- 29AEAFS4090N1ZH
- Website
- [email protected]
Its other registrations on RERA Karnataka
- SUMADHURA SOLEA PRM/KA/RERA/1251/446/PR/100326/008517 · approved 10 Mar 2026
- SUMADHURA EPITOME-I PRM/KA/RERA/1251/446/PR/190924/007044 · approved 19 Sep 2024
- ASPIRE AURUM A SUMADHURA VENTURE PRM/KA/RERA/1251/446/PR/200123/003229 · approved 23 Jan 2020
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/250222/004731 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/PS/EM/EO-1/TA-4/East/16/2021-21 · 10 Nov 2021
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell,Local Authority
Complaints to RERA about this project
- Builder is denying third party inspection 25 Nov 2024 · Posted For Orders Authority Fullbench
Documents
131 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station3.81 kmReliable
- Nearest railway station3.82 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km7Caveat
- Nearest lake / water body (≥2 ha)0.66 kmCaveat
Hospitals
- Nearest hospital0.85 kmCaveat
Schools
- Schools in pincode 560067 (UDISE+ census)57Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionKadugodi PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well60.8 m below groundCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)6.24 kmReliable
- Nearest sewage treatment plant0.88 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)6.96 kmCaveat
- Nearest commercial-airport runway17.86 kmReliable
- Distance to runway approach-path proxy16.63 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (13.02975, 77.75216), 2026-10-24. Each figure's source and caveat are in the full report.