Aryav Greenfields

by Aryav Constructions · 58 homes · 0.70 acres · 1 tower · Bengaluru East

Delivered late Completed: the builder filed for completion on 18 Apr 2023, 292 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 18 Apr 2023, 292 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
82 homes per acre

Similar projects within 3 km: 82 per acre. 54% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?2 due so far
50% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Aug 2019
  2. Approved by RERA9 Jan 2020
  3. First promised30 Jun 2022

    The date the builder gave at registration.

  4. Completion filed18 Apr 2023

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
853 sq ft
79 m² carpet · sizes 757–863 sq ft (9 at this size)
45 m² land share · 1 parking space
36 homes · 62% of the project
3BHK
961 sq ft
89 m² carpet · sizes 905–1,164 sq ft (3 at this size)
55 m² land share · 1 parking space
22 homes · 38% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Aryav Greenfields4 floors

Aryav Greenfields: 58 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project82
Typical within 3 km (87)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project54%
Typical within 3 km (89)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.70 acres

2,846 m²

Ground covered by buildings
46% of the land

1,309 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of Aryav Constructions on the map

The company

Registered as
Aryav Constructions
Type
Partnership Firm
PAN
ABEFA5275E

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹9.5 cr
Construction
₹15.5 cr
Total project cost
₹25.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.2 kmReliable
  • Nearest railway station4.08 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.64 kmCaveat

Hospitals

  • Nearest hospital1.27 kmCaveat

Schools

  • Schools in pincode 560036 (UDISE+ census)89Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionK.R. Puram PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km8Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.64 kmReliable
  • Nearest sewage treatment plant0.83 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)7.25 kmCaveat
  • Nearest commercial-airport runway20.51 kmReliable
  • Distance to runway approach-path proxy19.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.00385, 77.72460), 2026-10-24. Each figure's source and caveat are in the full report.