Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Arvind Sporcia

by Arvind SmartSpaces Limited · 456 homes · 4.92 acres · 7 towers · Bengaluru North

Delivered late Completed: the builder filed for completion on 29 Apr 2025, 2,221 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 29 Apr 2025, 2,221 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
93 homes per acre

Similar projects within 3 km: 74 per acre. 10% of the land is left open.

Any complaints?See the list
5 complaints

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
33% on time

Of its 4 RERA projects in Bengaluru Urban: 1 delivered on time, 2 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started14 Jul 2014
  2. Approved by RERA10 Oct 2017
  3. Completion filed29 Apr 2025

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
548 sq ft
51 m² carpet · sizes 548–778 sq ft (78 at this size)
28 m² land share · 1 parking space
316 homes · 69% of the project
2.5 BHK
911 sq ft
85 m² carpet · sizes 855–927 sq ft (28 at this size)
37 m² land share · 1 parking space
85 homes · 19% of the project
3BHK
967 sq ft
90 m² carpet · sizes 967–1,038 sq ft (14 at this size)
40 m² land share · 1 parking space
55 homes · 12% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A13 floors
B14 floors
C14 floors
D14 floors
E14 floors
F14 floors
G14 floors

A: 78 homes, 1 basement · B: 56 homes, 1 basement · C: 84 homes, 1 basement · D: 56 homes, 1 basement · E: 56 homes, 1 basement · F: 56 homes, 1 basement · G: 70 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project93
Typical within 3 km (86)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project10%
Typical within 3 km (86)57%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.92 acres

19,925 m²

Ground covered by buildings
16% of the land

3,177 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of Arvind SmartSpaces Limited on the map

Complaints to RERA about its other projects

The company

Registered as
Arvind SmartSpaces Limited
Type
Company
Company number
L45201GJ2008PLC055771

CIN or LLPIN, from the Registrar of Companies.

PAN
AAHCA5001H

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹40.0 cr
Construction
₹100.0 cr
Total project cost
₹140.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.57 kmReliable
  • Nearest railway station4.48 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)0.94 kmCaveat

Hospitals

  • Nearest hospital1.35 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km20.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSampigehalli PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.19 kmReliable
  • Nearest sewage treatment plant1.36 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.81 kmCaveat
  • Nearest commercial-airport runway15.87 kmReliable
  • Distance to runway approach-path proxy12.66 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (13.06240, 77.62223), 2026-10-24. Each figure's source and caveat are in the full report.