Upcoming Under construction, due Jul 2029. 11% built with 6% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
11% built

Due 1 Jul 2029. 6% of the time from RERA approval to the deadline has passed.

Built11%
Time used6%
How much is sold?175 left
0% booked

0 of 175 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
104 homes per acre

Similar projects within 3 km: 70 per acre. 72% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jun 2026
  2. Approved by RERA17 Aug 2026
  3. Today24 Oct 2026

    6% of the time to the deadline has passed.

  4. If it slips like a typical project2 Apr 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q2 2026-2711%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower-A0%
Tower-B0%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked175 leftQ2 2026-27

Still available: 41 × 2BHK + 2T, 55 × 3BHK + 2T, 79 × 3BHK + 3T.

Booked, by type

2BHK + 2T0 of 41
3BHK + 2T0 of 55
3BHK + 3T0 of 79

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK + 3T
1,090 sq ft
101 m² carpet · sizes 1,077–1,128 sq ft (24 at this size)
35 m² land share · 19 m² balcony/terrace · 1 parking space
79 homes · 45% of the project
3BHK + 2T
939 sq ft
87 m² carpet · sizes 939–982 sq ft (28 at this size)
31 m² land share · 17 m² balcony/terrace · 1 parking space
55 homes · 31% of the project
2BHK + 2T
766 sq ft
71 m² carpet · sizes 751–792 sq ft (14 at this size)
23 m² land share · 10 m² balcony/terrace · 1 parking space
41 homes · 23% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-A13 floors
Tower-B14 floors

Tower-A: 64 homes, 42 m tall, 1 basement · Tower-B: 111 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project104
Typical within 3 km (7)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (7)72%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.67 acres

6,778 m²

Ground covered by buildings
29% of the land

1,934 m²

Floor-area ratio
3.49

Floors built per unit of land: 3.49 m² of floors for each m² of land.

Parking
1.11 per home

195 covered, 0 open

Built-up area, all floors
3,03,004 sq ft

28,150 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
MANASOUBHAGYA VENTURES LLP
Type
Partnership Firm
Company number
ACI-2519

CIN or LLPIN, from the Registrar of Companies.

PAN
ACBFM0474D
GSTIN
29ACBFM0474D1ZF
Website
WWW.MANASOUBHAGYA.COM

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹4.5 crBuilding and development ₹75.0 crTotal ₹79.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station14.29 kmReliable
  • Nearest railway station2.2 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.66 kmCaveat

Hospitals

  • Nearest hospital1.97 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajanukunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km6Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.37 kmReliable
  • Nearest sewage treatment plant6.3 kmCaveat
  • Industrial zones within 1 km5Caveat
  • Nearest airfield runway (any, incl. military)6.31 kmCaveat
  • Nearest commercial-airport runway15.76 kmReliable
  • Distance to runway approach-path proxy7.63 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.16906, 77.54613), 2026-10-24. Each figure's source and caveat are in the full report.