Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ANKURAA LOTUS

by M/s.Ankuraa Developers · 84 homes · 0.97 acres · 1 tower · Bengaluru South

Delivered late Completed: the builder filed for completion on 17 Apr 2024, 749 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 17 Apr 2024, 749 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
86 homes per acre

Similar projects within 3 km: 72 per acre. 73% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started6 Sep 2019
  2. Approved by RERA25 Oct 2019
  3. First promised30 Mar 2022

    The date the builder gave at registration.

  4. Completion filed17 Apr 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3 Bhk
1,023 sq ft
95 m² carpet · sizes 978–1,055 sq ft (13 at this size)
52 m² land share · 1 parking space
41 homes · 49% of the project
2 Bhk
823 sq ft
76 m² carpet · sizes 787–823 sq ft (20 at this size)
41 m² land share · 1 parking space
40 homes · 48% of the project
2Bhk
807 sq ft
75 m² carpet · sizes 807–823 sq ft (1 at this size)
41 m² land share · 1 parking space
2 homes · 2% of the project
3Bhk
1,023 sq ft
95 m² carpet
52 m² land share · 2 parking spaces
1 home · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A11 floors

A: 84 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project86
Typical within 3 km (66)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project73%
Typical within 3 km (66)67%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.97 acres

3,943 m²

Ground covered by buildings
27% of the land

1,054 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of M/s.Ankuraa Developers on the map

The company

Registered as
M/s.Ankuraa Developers
Type
Partnership Firm
PAN
ABGFA2636P

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹9.0 cr
Construction
₹30.5 cr
Total project cost
₹39.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1 kmReliable
  • Nearest railway station2.02 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)1.2 kmCaveat

Hospitals

  • Nearest hospital1.09 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km9Caveat
  • Median pupil-teacher ratio, schools within 1 km21.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionWhitefield PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km9Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.77 kmReliable
  • Nearest sewage treatment plant2.16 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)5.82 kmCaveat
  • Nearest commercial-airport runway23.51 kmReliable
  • Distance to runway approach-path proxy22.16 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.97868, 77.75682), 2026-10-24. Each figure's source and caveat are in the full report.