Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ANIKA REDWOOD HOMES

by Anika Developers · 51 homes · 0.90 acres · 1 tower · Bengaluru South

Delivered late Completed: the builder filed for completion on 29 Mar 2026, 1,914 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 29 Mar 2026, 1,914 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
57 homes per acre

Similar projects within 3 km: 90 per acre. 62% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started6 Jul 2018
  2. Approved by RERA8 Jan 2019
  3. First promised31 Dec 2020

    The date the builder gave at registration.

  4. Completion filed29 Mar 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2 BHK
828 sq ft
77 m² carpet · sizes 828–966 sq ft (7 at this size)
49 m² land share · 1 parking space
32 homes · 63% of the project
3 BHK
1,030 sq ft
96 m² carpet · sizes 1,030–1,992 sq ft (6 at this size)
54 m² land share · 1 parking space
19 homes · 37% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Anika Redwood Homes7 floors

Anika Redwood Homes: 51 homes, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project57
Typical within 3 km (13)90
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project62%
Typical within 3 km (14)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.90 acres

3,635 m²

Ground covered by buildings
38% of the land

1,383 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Anika Developers on the map

The company

Registered as
Anika Developers
Type
Company

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹14.0 cr
Construction
₹18.0 cr
Total project cost
₹32.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.46 kmReliable
  • Nearest railway station2.04 kmReliable
  • Bus stops within 500 m13Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km29Caveat
  • Nearest lake / water body (≥2 ha)0.52 kmCaveat

Hospitals

  • Nearest hospital0.2 kmCaveat

Schools

  • Schools in pincode 560072 (UDISE+ census)64Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km19Caveat
  • Median pupil-teacher ratio, schools within 1 km23.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)10Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionChandra Layout PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)11 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km5Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)15.69 kmReliable
  • Nearest sewage treatment plant2.8 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)14.59 kmCaveat
  • Nearest commercial-airport runway31.31 kmReliable
  • Distance to runway approach-path proxy26.05 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.96070, 77.52013), 2026-10-24. Each figure's source and caveat are in the full report.