Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

AMOGAYA ADORIT

by M/s AMOGAYA PROJECTS · 130 homes · 1.91 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Mar 2030. 40% built with 30% of the time used. 42% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
40% built

Due 31 Mar 2030. 30% of the time from RERA approval to the deadline has passed.

Built40%
Time used30%
How much is sold?76 left
42% booked

54 of 130 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 69 per acre. 80% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2025
  2. Approved by RERA23 Apr 2025
  3. Today24 Oct 2026

    30% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2631%
Q4 2025-2633%
Q1 2026-2752%
Q2 2026-2740%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower-B9%
Tower-A27%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

54 booked76 leftQ2 2026-27

Still available: 9 × 2.5 BHK, 67 × 3 BHK.

Booked, by type

2.5 BHK4 of 13
3 BHK50 of 117

Booked, each quarter

Q3 2025-2627 of 130
Q4 2025-260 of 130
Q1 2026-2755 of 130
Q2 2026-2754 of 130

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,105 sq ft60 homes102.7 m²
  • 1,087 sq ft29 homes101.0 m²
  • 1,096 sq ft28 homes101.8 m²
Typically 61 m² land share · 29 m² balcony/terrace · 1 parking space
117 homes · 90% of the project
2.5 BHK
  • 850 sq ft13 homes79.0 m²
Typically 44 m² land share · 15 m² balcony/terrace · 1 parking space
13 homes · 10% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-B14 floors
Tower-A14 floors

Tower-B: 70 homes, 45 m tall, 1 basement · Tower-A: 60 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (42)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project80%
Typical within 3 km (42)71%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.91 acres

7,714 m²

Ground covered by buildings
20% of the land

1,566 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
1.25 per home

163 covered, 0 open

Built-up area, all floors
2,77,192 sq ft

25,752 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
M/s AMOGAYA PROJECTS
Type
Partnership Firm
PAN
ACBFA0474B
GSTIN
29ACBFA0474B1ZV

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹45.8 crBuilding and development ₹84.0 crTotal ₹129.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹2.5 cr₹2.5 cr
Q4 2025-26₹8.8 cr₹5.8 cr
Q1 2026-27₹5.9 cr₹4.2 cr
Q2 2026-27₹6.0 cr₹3.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.24 kmReliable
  • Nearest railway station7.19 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.71 kmCaveat

Hospitals

  • Nearest hospital2.8 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.57 kmReliable
  • Nearest sewage treatment plant0.31 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)8.92 kmCaveat
  • Nearest commercial-airport runway14.5 kmReliable
  • Distance to runway approach-path proxy13.15 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.06115, 77.75518), 2026-10-24. Each figure's source and caveat are in the full report.