RERA project · Residential/Group Housing

AFTER THE RAIN-PHASE IIB

by Total Environment Building Systems Private Limited · 37 homes · 5.25 acres · 5 towers · Bengaluru North

Past due, no completion filed Past its deadline of 1 Aug 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 1 Aug 2026, and no completion is filed.

How much is sold?1 left
97% booked

36 of 37 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
7 homes per acre

Similar projects within 3 km: 47 per acre. 55% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 13 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?9 due so far
11% on time

Of its 22 RERA projects in Bengaluru Urban: 1 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 13 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA15 Oct 2019
  2. Work started1 Nov 2019
  3. First promised1 Nov 2024

    The date the builder gave at registration.

  4. Deadline (extended)1 Aug 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2698%
Q4 2025-2662%
Q1 2026-2761%
Q2 2026-2761%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 2351%
Block 2443%
Block 2555%
Block 2635%
Block 2740%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

36 booked1 leftQ2 2026-27

Still available: 1 × 4BHK.

Booked, by type

4BHK36 of 37

Booked, each quarter

Q3 2025-2633 of 37
Q4 2025-2633 of 37
Q1 2026-2736 of 37
Q2 2026-2736 of 37

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4BHK
2,702 sq ft
251 m² carpet · sizes 2,669–4,058 sq ft (16 at this size)
157 m² balcony/terrace · 2 parking spaces
37 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 231 floor
Block 241 floor
Block 251 floor
Block 261 floor
Block 271 floor

Block 23: 5 homes, 1 basement · Block 24: 8 homes · Block 25: 8 homes · Block 26: 6 homes, 1 basement · Block 27: 10 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project7
Typical within 3 km (11)47
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project55%
Typical within 3 km (11)75%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.25 acres

21,246 m²

Ground covered by buildings
45% of the land

9,519 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 22 RERA projects of Total Environment on the map

Complaints to RERA about its other projects

The company

Registered as
Total Environment Building Systems Private Limited
Type
Company
Company number
U45202KA1996PTC020790

CIN or LLPIN, from the Registrar of Companies.

PAN
AABCT9452F

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹44.7 cr
Construction
₹114.9 cr
Total project cost
₹159.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹47.4 lakh₹47.4 lakh
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹5.1 cr₹5.1 cr
Q2 2026-27₹3.6 cr₹3.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station15.89 kmReliable
  • Nearest railway station4.68 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.91 kmCaveat

Hospitals

  • Nearest hospital0.97 kmCaveat

Schools

  • Schools in pincode 562157 (UDISE+ census)56Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionChikkajala PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km14Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.92 kmReliable
  • Nearest sewage treatment plant3.98 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.47 kmCaveat
  • Nearest commercial-airport runway9.82 kmReliable
  • Distance to runway approach-path proxy2.36 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.15819, 77.60531), 2026-10-24. Each figure's source and caveat are in the full report.