RERA project · Residential/Group Housing
ADITHYA VALIOSO
by ADITHYA CONSTRUCTIONS · 156 homes · 2.73 acres · 2 towers · Bengaluru East
Upcoming Under construction, due Dec 2027. 97% built with 64% of the time used. 52% of homes booked.
At a glance
Due 31 Dec 2027. 64% of the time from RERA approval to the deadline has passed.
81 of 156 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 76 per acre. 52% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 4 RERA projects in Bengaluru Urban: 2 delivered on time, 1 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Jul 2024
- Approved by RERA13 Sep 2024
- Today24 Oct 2026
64% of the time to the deadline has passed.
- Deadline31 Dec 2027
The date it must be complete by.
- If it slips like a typical project1 Oct 2028
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 17 × 2BHK, 58 × 3BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A: 68 homes, 15 m tall, 1 basement · B: 88 homes, 15 m tall, 1 basement
Amenities
- Electricity 10 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.73 acres
- Ground covered by buildings
- 48% of the land
- Floor-area ratio
- 1.75
- Parking
- 1.10 per home
- Built-up area, all floors
- 2,69,776 sq ft
11,052 m²
5,317 m²
Floors built per unit of land: 1.75 m² of floors for each m² of land.
172 covered, 0 open
25,063 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 4 RERA projects of ADITHYA CONSTRUCTIONS on the map
The company
- Registered as
- ADITHYA CONSTRUCTIONS
- Type
- Partnership Firm
- PAN
- ABDFA2198K
- GSTIN
- 29ABDFA2198K1Z3
Its other registrations on RERA Karnataka
- ADITHYA RICA PRM/KA/RERA/1251/446/PR/060822/005137 · approved 6 Aug 2022
- ADITHYA ESQUINA PRM/KA/RERA/1251/446/PR/171208/001241 · approved 8 Dec 2017
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/130924/007017 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Ad.Com./MDP/0486/23-24 · 1 Dec 2023
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
154 files on the RERA page: Approved plan ↗, Commencement certificate ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹8.3 cr | ₹7.6 cr |
| Q4 2025-26 | ₹6.7 cr | ₹6.7 cr |
| Q1 2026-27 | ₹8.6 cr | ₹8.2 cr |
| Q2 2026-27 | ₹6.4 cr | ₹8.6 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station4.19 kmReliable
- Nearest railway station5.28 kmReliable
- Bus stops within 500 m1Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km1Caveat
- Nearest lake / water body (≥2 ha)2.23 kmCaveat
Hospitals
- Nearest hospital1.14 kmCaveat
Schools
- Schools in pincode 560087 (UDISE+ census)55Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
- Schools with library + playground + ICT lab (1 km)1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionWhitefield PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well33.1 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km3Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)13.08 kmReliable
- Nearest sewage treatment plant4.14 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)7.55 kmCaveat
- Nearest commercial-airport runway26.78 kmReliable
- Distance to runway approach-path proxy25.43 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.94888, 77.75645), 2026-10-24. Each figure's source and caveat are in the full report.