RERA project · Residential/Group Housing
ADITHYA RICA
by ADITHYA CONSTRUCTIONS · 116 homes · 1.74 acres · 2 towers · Bengaluru East
Delivered on time Completed: the builder filed for completion on 19 Aug 2024, by the date it promised.
At a glance
The builder filed for completion on 19 Aug 2024, by the date it promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 77 per acre. 53% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 4 RERA projects in Bengaluru Urban: 2 delivered on time, 1 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started2 Oct 2021
- Approved by RERA6 Aug 2022
- Completion filed19 Aug 2024
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A Block: 72 homes, 15 m tall · Block B: 44 homes, 15 m tall
Amenities
- Electricity 20 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.74 acres
- Ground covered by buildings
- 47% of the land
- Floor-area ratio
- 12577.00
- Parking
- 1.00 per home
- Built-up area, all floors
- 1,70,780 sq ft
7,026 m²
3,295 m²
Floors built per unit of land: 12577.00 m² of floors for each m² of land.
116 covered, 0 open
15,866 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 4 RERA projects of ADITHYA CONSTRUCTIONS on the map
The company
- Registered as
- ADITHYA CONSTRUCTIONS
- Type
- Partnership Firm
- PAN
- ABDFA2198K
- GSTIN
- 29ABDFA2198K1Z3
Its other registrations on RERA Karnataka
- ADITHYA VALIOSO PRM/KA/RERA/1251/446/PR/130924/007017 · approved 13 Sep 2024
- ADITHYA ESQUINA PRM/KA/RERA/1251/446/PR/171208/001241 · approved 8 Dec 2017
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/060822/005137 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Ad.Com/MDP/0012/21-22 · 18 Aug 2021
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell
Complaints to RERA about this project
None on RERA Karnataka.
Documents
123 files on the RERA page: Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station3.96 kmReliable
- Nearest railway station4.96 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)2.16 kmCaveat
Hospitals
- Nearest hospital1.49 kmCaveat
Schools
- Schools in pincode 560087 (UDISE+ census)55Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionWhitefield PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km2Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)13.41 kmReliable
- Nearest sewage treatment plant4 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)7.18 kmCaveat
- Nearest commercial-airport runway26.5 kmReliable
- Distance to runway approach-path proxy25.1 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (12.95166, 77.75840), 2026-10-24. Each figure's source and caveat are in the full report.