Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Adarsh Welkin Park Phase 1

by Akarshak Realty Private Limited · 832 homes · 13.69 acres · 2 towers · Anekal

Upcoming Under construction, due Dec 2027. 88% built with 73% of the time used. 98% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
88% built

Due 31 Dec 2027. 73% of the time from RERA approval to the deadline has passed.

Built88%
Time used73%
How much is sold?19 left
98% booked

813 of 832 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
61 homes per acre

Similar projects within 3 km: 73 per acre. 90% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 4 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2023
  2. Approved by RERA2 Sep 2023
  3. Today24 Oct 2026

    73% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2662%
Q4 2025-2670%
Q1 2026-2778%
Q2 2026-2788%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 272%
Block 573%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

813 booked19 leftQ2 2026-27

Still available: 19 × 3 BHK.

Booked, by type

2 BHK6 of 6
3 BHK703 of 722
1 BHK1 of 1
2.5 BHK103 of 103

Booked, each quarter

Q3 2025-26808 of 832
Q4 2025-26812 of 832
Q1 2026-27812 of 832
Q2 2026-27813 of 832

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,245 sq ft364 homes115.7 m²
  • 1,259 sq ft182 homes117.0 m²
  • 1,192 sq ft175 homes110.7 m²
  • 812 sq ft1 home75.4 m²
Typically 35 m² land share · 15 m² balcony/terrace · 1 parking space
722 homes · 87% of the project
2.5 BHK
  • 995 sq ft52 homes92.4 m²
  • 977 sq ft26 homes90.8 m²
  • 918 sq ft25 homes85.3 m²
Typically 27 m² land share · 8 m² balcony/terrace · 1 parking space
103 homes · 12% of the project
2 BHK
  • 812 sq ft6 homes75.4 m²
Typically 23 m² land share · 10 m² balcony/terrace · 1 parking space
6 homes · 1% of the project
1 BHK
  • 663 sq ft1 home61.6 m²
Typically 18 m² land share · 4 m² balcony/terrace · 1 parking space
1 home · 0% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 225 floors
Block 525 floors

Block 2: 312 homes, 68 m tall, 2 basements · Block 5: 520 homes, 68 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project61
Typical within 3 km (75)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project90%
Typical within 3 km (75)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
13.69 acres

55,408 m²

Ground covered by buildings
10% of the land

5,386 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.00 per home

832 covered, 0 open

Built-up area, all floors
18,82,402 sq ft

1,74,881 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

Complaints to RERA about its other projects

The company

Registered as
Akarshak Realty Private Limited
Type
Company
Company number
U45200KA2011PTC059903

CIN or LLPIN, from the Registrar of Companies.

PAN
AAJCA7571N
GSTIN
29AAJCA7571N1ZW
Website
www.adarshdevelopers.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹16.1 crBuilding and development ₹733.0 crTotal ₹749.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹455.6 cr₹449.0 cr
Q4 2025-26₹506.6 cr₹503.5 cr
Q1 2026-27₹570.7 cr₹565.2 cr
Q2 2026-27₹649.7 cr₹642.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.9 kmReliable
  • Nearest railway station4.73 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.01 kmCaveat

Hospitals

  • Nearest hospital2.34 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.14 kmReliable
  • Nearest sewage treatment plant1.69 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.15 kmCaveat
  • Nearest commercial-airport runway35.49 kmReliable
  • Distance to runway approach-path proxy34.72 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.86863, 77.68725), 2026-10-24. Each figure's source and caveat are in the full report.