Adarsh Tropica (Phase-2)

by ORCHIDS APARTMENTS PVT LTD · 694 homes · 10.26 acres · 6 towers · Bengaluru East

Upcoming Under construction, due Jul 2029. 15% built with 37% of the time used. 63% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
15% built

Due 31 Jul 2029. 37% of the time from RERA approval to the deadline has passed.

Built15%
Time used37%
How much is sold?254 left
63% booked

440 of 694 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 70 per acre. 80% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2024
  2. Approved by RERA1 Mar 2025
  3. Today24 Oct 2026

    37% of the time to the deadline has passed.

  4. If it slips like a typical project2 May 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-266%
Q4 2025-269%
Q1 2026-2713%
Q2 2026-2715%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 3 (Wing-A,B,C & D)13%
Block 4 (Wing-A&B)35%
Block 5 (Wing-A&B)4%
Block 6 (Wing-A)0%
Block 7 (Wing-A)0%
Block 8 (Wing-A&B)4%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

440 booked254 leftQ2 2026-27

Still available: 88 × 2.5 BHK, 43 × 1 BHK, 42 × 2 BHK, 81 × 3 BHK.

Booked, by type

2.5 BHK224 of 312
1 BHK61 of 104
2 BHK62 of 104
3 BHK93 of 174

Booked, each quarter

Q3 2025-26211 of 694
Q4 2025-26289 of 694
Q1 2026-27289 of 694
Q2 2026-27440 of 694

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2.5 BHK
891 sq ft
83 m² carpet
35 m² land share · 1 parking space
312 homes · 45% of the project
3 BHK
1,051 sq ft
98 m² carpet
40 m² land share · 1 parking space
174 homes · 25% of the project
2 BHK
819 sq ft
76 m² carpet
32 m² land share · 1 parking space
104 homes · 15% of the project
1 BHK
230 sq ft
21 m² carpet
8 m² land share · 1 parking space
104 homes · 15% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 3 (Wing-A,B,C & D)13 floors
Block 4 (Wing-A&B)13 floors
Block 5 (Wing-A&B)13 floors
Block 6 (Wing-A)5 floors
Block 7 (Wing-A)5 floors
Block 8 (Wing-A&B)13 floors

Block 3 (Wing-A,B,C & D): 208 homes, 42 m tall, 1 basement · Block 4 (Wing-A&B): 208 homes, 42 m tall, 1 basement · Block 5 (Wing-A&B): 104 homes, 42 m tall, 1 basement · Block 6 (Wing-A): 35 homes, 18 m tall, 1 basement · Block 7 (Wing-A): 35 homes, 18 m tall, 1 basement · Block 8 (Wing-A&B): 104 homes, 42 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (111)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project80%
Typical within 3 km (111)67%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
10.26 acres

41,530 m²

Ground covered by buildings
20% of the land

8,201 m²

Floor-area ratio
1.96

Floors built per unit of land: 1.96 m² of floors for each m² of land.

Parking
1.10 per home

614 covered, 150 open

Built-up area, all floors
12,37,924 sq ft

1,15,007 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

The company

Registered as
ORCHIDS APARTMENTS PVT LTD
Type
Company
Company number
U45201KA1981PTC004086

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACO2209G
GSTIN
29AAACO2209G2ZO
Website
www.adarshdevelopers.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s ORCHIDS APARTMENTS PVT LTD Rep B M Karunesh.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹127.8 crBuilding and development ₹577.6 crTotal ₹705.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹27.1 cr₹21.2 cr
Q4 2025-26₹47.6 cr₹41.9 cr
Q1 2026-27₹72.2 cr₹49.7 cr
Q2 2026-27₹91.2 cr₹64.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.48 kmReliable
  • Nearest railway station2.69 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km12Caveat
  • Nearest lake / water body (≥2 ha)1.26 kmCaveat

Hospitals

  • Nearest hospital1.05 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.7 kmReliable
  • Nearest sewage treatment plant2.58 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)7.1 kmCaveat
  • Nearest commercial-airport runway33.38 kmReliable
  • Distance to runway approach-path proxy32.68 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.88769, 77.69128), 2026-10-24. Each figure's source and caveat are in the full report.