Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ADARSH PRIMROSE

by AKARSH DWELLINGS PRIVATE LIMITED · 172 homes · 2.33 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Sep 2028. 18% built with 45% of the time used. 44% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
18% built

Due 30 Sep 2028. 45% of the time from RERA approval to the deadline has passed.

Built18%
Time used45%
How much is sold?97 left
44% booked

75 of 172 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
74 homes per acre

Similar projects within 3 km: 82 per acre. 55% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Nov 2024
  2. Approved by RERA14 Mar 2025
  3. Today24 Oct 2026

    45% of the time to the deadline has passed.

  4. If it slips like a typical project2 Jul 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-269%
Q4 2025-2616%
Q1 2026-2716%
Q2 2026-2718%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing -A40%
Wing -B23%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

75 booked97 leftQ2 2026-27

Still available: 38 × 2 BHK, 55 × 3 BHK, 4 × 2.5 BHK.

Booked, by type

2 BHK44 of 82
3 BHK31 of 86
2.5 BHK0 of 4

Booked, each quarter

Q3 2025-260 of 172
Q4 2025-263 of 172
Q1 2026-2769 of 172
Q2 2026-2775 of 172

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,133 sq ft
105 m² carpet · sizes 997–1,137 sq ft (28 at this size)
48 m² land share · 39 m² balcony/terrace · 1 parking space
86 homes · 50% of the project
2 BHK
953 sq ft
88 m² carpet · sizes 778–953 sq ft (52 at this size)
42 m² land share · 34 m² balcony/terrace · 1 parking space
82 homes · 48% of the project
2.5 BHK
953 sq ft
88 m² carpet
42 m² land share · 34 m² balcony/terrace · 1 parking space
4 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing -A8 floors
Wing -B14 floors

Wing -A: 61 homes, 27 m tall, 2 basements · Wing -B: 111 homes, 45 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project74
Typical within 3 km (127)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project55%
Typical within 3 km (127)77%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.33 acres

9,409 m²

Ground covered by buildings
45% of the land

4,254 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.85 per home

48 covered, 22 open

Built-up area, all floors
3,95,380 sq ft

36,732 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

The company

Registered as
AKARSH DWELLINGS PRIVATE LIMITED
Type
Company
Company number
U45201KA2009PTC051472

CIN or LLPIN, from the Registrar of Companies.

PAN
AAICA0756A
GSTIN
29AAICA0756A1ZZ
Website
www.adarshdevelopers.com

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹11.5 crBuilding and development ₹198.8 crTotal ₹210.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹5.2 cr
Q4 2025-26₹0.0 lakh₹8.8 cr
Q1 2026-27₹39.0 lakh₹9.9 cr
Q2 2026-27₹47.0 lakh₹17.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.39 kmReliable
  • Nearest railway station2.39 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.42 kmCaveat

Hospitals

  • Nearest hospital1.31 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.61 kmReliable
  • Nearest sewage treatment plant2.49 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)5.67 kmCaveat
  • Nearest commercial-airport runway29.91 kmReliable
  • Distance to runway approach-path proxy29.18 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.91880, 77.72454), 2026-10-24. Each figure's source and caveat are in the full report.