Adarsh Parkland Phase 2

by SHIVAKAR INFRA PRIVATE LIMITED · 1,050 homes · 11.83 acres · 4 towers · Bengaluru East

Upcoming Under construction, due Mar 2030. 6% built with 16% of the time used. 24% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
6% built

Due 30 Mar 2030. 16% of the time from RERA approval to the deadline has passed.

Built6%
Time used16%
How much is sold?803 left
24% booked

247 of 1,050 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
89 homes per acre

Similar projects within 3 km: 80 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started14 Jan 2026
  2. Approved by RERA21 Feb 2026
  3. Today24 Oct 2026

    16% of the time to the deadline has passed.

  4. If it slips like a typical project30 Dec 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-262%
Q1 2026-275%
Q2 2026-276%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 412%
Block 523%
Block 60%
Block 70%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

247 booked803 leftQ2 2026-27

Still available: 211 × 2.5 BHK, 284 × 3 BHK, 154 × 1 BHK, 154 × 2 BHK.

Booked, by type

2.5 BHK125 of 336
3 BHK122 of 406
1 BHK0 of 154
2 BHK0 of 154

Booked, each quarter

Q4 2025-260 of 1,050
Q1 2026-27137 of 1,050
Q2 2026-27247 of 1,050

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,223 sq ft
114 m² carpet
52 m² land share · 36 m² balcony/terrace · 1 parking space
406 homes · 39% of the project
2.5 BHK
947 sq ft
88 m² carpet
41 m² land share · 29 m² balcony/terrace · 1 parking space
336 homes · 32% of the project
2 BHK
972 sq ft
90 m² carpet
41 m² land share · 29 m² balcony/terrace · 1 parking space
154 homes · 15% of the project
1 BHK
250 sq ft
23 m² carpet
10 m² land share · 7 m² balcony/terrace · 1 parking space
154 homes · 15% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 414 floors
Block 514 floors
Block 614 floors
Block 714 floors

Block 4: 224 homes, 45 m tall, 1 basement · Block 5: 224 homes, 45 m tall, 1 basement · Block 6: 168 homes, 45 m tall, 1 basement · Block 7: 434 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (122)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (122)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
11.83 acres

47,891 m²

Ground covered by buildings
22% of the land

10,638 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.08 per home

1,021 covered, 115 open

Built-up area, all floors
19,19,838 sq ft

1,78,359 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

The company

Registered as
SHIVAKAR INFRA PRIVATE LIMITED
Type
Company
Company number
U45200KA2011PTC059868

CIN or LLPIN, from the Registrar of Companies.

PAN
AAQCS2460R
GSTIN
29AAQCS2460R1ZD
Website
www.adarshdevelopers.com

The land is owned together with others (a joint development), including M/s Shivakar Infra Private Limited Rep by its Director Mr.B.M Jayeshankar.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹264.4 crBuilding and development ₹746.3 crTotal ₹1010.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹0.0 lakh₹6.9 cr
Q1 2026-27₹9.4 cr₹8.8 cr
Q2 2026-27₹31.8 cr₹25.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.97 kmReliable
  • Nearest railway station2.88 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital0.88 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.97 kmReliable
  • Nearest sewage treatment plant0.98 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)3.63 kmCaveat
  • Nearest commercial-airport runway28.38 kmReliable
  • Distance to runway approach-path proxy27.84 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.93275, 77.71178), 2026-10-24. Each figure's source and caveat are in the full report.