RERA project · Residential/Group Housing

Adarsh Parkland Phase 1

by AKARSHA REALTY PRIVATE LIMITED · 644 homes · 8.65 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Dec 2027. 74% built with 73% of the time used. 65% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
74% built

Due 31 Dec 2027. 73% of the time from RERA approval to the deadline has passed.

Built74%
Time used73%
How much is sold?227 left
65% booked

417 of 644 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
74 homes per acre

Similar projects within 3 km: 80 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 9 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jun 2023
  2. Approved by RERA11 Aug 2023
  3. Today24 Oct 2026

    73% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2653%
Q4 2025-2660%
Q1 2026-2765%
Q2 2026-2774%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 171%
Block 280%
Block 378%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

417 booked227 leftQ2 2026-27

Still available: 2 × 1 BHK, 225 × 2 BHK.

Booked, by type

1 BHK110 of 112
2 BHK307 of 532

Booked, each quarter

Q3 2025-26417 of 644
Q4 2025-26417 of 644
Q1 2026-27417 of 644
Q2 2026-27417 of 644

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
643 sq ft
60 m² carpet · sizes 643–662 sq ft (504 at this size)
28 m² land share · 1 parking space
532 homes · 83% of the project
1 BHK
425 sq ft
40 m² carpet
18 m² land share · 1 parking space
112 homes · 17% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 114 floors
Block 214 floors
Block 314 floors

Block 1: 224 homes, 45 m tall, 1 basement · Block 2: 168 homes, 45 m tall, 1 basement · Block 3: 252 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project74
Typical within 3 km (122)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (122)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
8.65 acres

35,018 m²

Ground covered by buildings
11% of the land

3,679 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.00 per home

504 covered, 140 open

Built-up area, all floors
7,25,358 sq ft

67,388 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

Complaints to RERA about its other projects

The company

Registered as
AKARSHA REALTY PRIVATE LIMITED
Type
Company
PAN
AAHCA3322M
Website
www.adarshdevelopers.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.5 crBuilding and development ₹249.0 crTotal ₹254.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹135.8 cr₹142.2 cr
Q4 2025-26₹152.3 cr₹164.6 cr
Q1 2026-27₹165.6 cr₹164.6 cr
Q2 2026-27₹183.9 cr₹183.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.97 kmReliable
  • Nearest railway station2.88 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital0.88 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.97 kmReliable
  • Nearest sewage treatment plant0.98 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)3.63 kmCaveat
  • Nearest commercial-airport runway28.38 kmReliable
  • Distance to runway approach-path proxy27.84 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.93275, 77.71178), 2026-10-24. Each figure's source and caveat are in the full report.