Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Adarsh Palm Retreat Mayberry-Phase 1

by Akarsh Residence Pvt Ltd · 312 homes · 3.15 acres · 6 towers · Bengaluru South

Upcoming Under construction, due Mar 2027, after an extension. 60% built with 95% of the time used. 55% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
60% built

Due 31 Mar 2027. 95% of the time from RERA approval to the deadline has passed.

Built60%
Time used95%
How much is sold?139 left
55% booked

173 of 312 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
99 homes per acre

Similar projects within 3 km: 68 per acre. 68% of the land is left open.

Any complaints?See the list
14 complaints

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?20 due so far
0% on time

Of its 41 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 18 past due with no completion filed, 20 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Nov 2017
  2. Approved by RERA7 Dec 2017
  3. First promised30 Nov 2021

    The date the builder gave at registration.

  4. Today24 Oct 2026

    95% of the time to the deadline has passed.

  5. If it slips like a typical project31 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-2760%
Q2 2026-2760%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A80%
Block B80%
Block C80%
Block D80%
Block E80%
Block F80%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

173 booked139 leftQ2 2026-27

Still available: 116 × 3BHK, 23 × 2BHK.

Booked, by type

3BHK148 of 264
2BHK25 of 48

Booked, each quarter

Q1 2026-27173 of 312
Q2 2026-27173 of 312

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
1,178 sq ft
109 m² carpet · sizes 1,095–1,265 sq ft (48 at this size)
36 m² land share · 27 m² balcony/terrace · 1 parking space
264 homes · 85% of the project
2BHK
776 sq ft
72 m² carpet · sizes 776–910 sq ft (12 at this size)
27 m² land share · 20 m² balcony/terrace · 1 parking space
48 homes · 15% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A12 floors
Block B12 floors
Block C12 floors
Block D12 floors
Block E12 floors
Block F12 floors

Block A: 48 homes, 2 basements · Block B: 48 homes, 2 basements · Block C: 72 homes, 2 basements · Block D: 48 homes, 2 basements · Block E: 48 homes, 2 basements · Block F: 48 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project99
Typical within 3 km (101)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project68%
Typical within 3 km (101)64%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.15 acres

12,749 m²

Ground covered by buildings
32% of the land

4,126 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 41 RERA projects of Adarsh Developers on the map

The company

Registered as
Akarsh Residence Pvt Ltd
Type
Company
Company number
U45201KA2009PTC051265

CIN or LLPIN, from the Registrar of Companies.

PAN
AAICA0191P

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹37.8 cr
Construction
₹141.3 cr
Total project cost
₹179.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹159.2 cr₹174.9 cr
Q2 2026-27₹159.2 cr₹174.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.86 kmReliable
  • Nearest railway station1.74 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.46 kmCaveat

Hospitals

  • Nearest hospital0.9 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.75 kmReliable
  • Nearest sewage treatment plant0.7 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)4.63 kmCaveat
  • Nearest commercial-airport runway30.92 kmReliable
  • Distance to runway approach-path proxy30.21 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.91000, 77.69000), 2026-10-24. Each figure's source and caveat are in the full report.