Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ABHEE CITY URBAN GLENN PHASE I

by ABHEE VENTURES PRIVATE LIMITED · 566 homes · 6.06 acres · 3 towers · Anekal

Upcoming Under construction, due Dec 2033. 3% built with 2% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
3% built

Due 31 Dec 2033. 2% of the time from RERA approval to the deadline has passed.

Built3%
Time used2%
How much is sold?566 left
0% booked

0 of 566 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
94 homes per acre

Similar projects within 3 km: 73 per acre. 89% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?5 due so far
0% on time

Of its 10 RERA projects in Bengaluru Urban: 0 delivered on time, 4 late (after the date first promised), 1 past due with no completion filed, 5 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started10 Jul 2026
  2. Approved by RERA25 Aug 2026
  3. Today24 Oct 2026

    2% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2034

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q2 2026-273%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower-40%
Tower-50%
Tower-60%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked566 leftQ2 2026-27

Still available: 74 × 2 BHK, 356 × 3 BHK, 66 × 3.5 BHK, 70 × 4.5 BHK.

Booked, by type

2 BHK0 of 74
3 BHK0 of 356
3.5 BHK0 of 66
4.5 BHK0 of 70

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,079 sq ft108 homes100.2 m²
  • 1,116 sq ft106 homes103.7 m²
  • 1,017 sq ft72 homes94.5 m²
  • 942 sq ft70 homes87.5 m²
Typically 46 m² land share · 1 parking space
356 homes · 63% of the project
2 BHK
  • 786 sq ft68 homes73.0 m²
  • 800 sq ft2 homes74.3 m²
  • 873 sq ft2 homes81.1 m²
  • 992 sq ft2 homes92.2 m²
Typically 33 m² land share · 1 parking space
74 homes · 13% of the project
4.5 BHK
  • 1,643 sq ft70 homes152.6 m²
Typically 71 m² land share · 1 parking space
70 homes · 12% of the project
3.5 BHK
  • 1,283 sq ft66 homes119.2 m²
Typically 56 m² land share · 1 parking space
66 homes · 12% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-435 floors
Tower-535 floors
Tower-634 floors

Tower-4: 214 homes, 108 m tall, 2 basements · Tower-5: 214 homes, 108 m tall, 2 basements · Tower-6: 138 homes, 110 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project94
Typical within 3 km (49)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project89%
Typical within 3 km (50)75%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
6.06 acres

24,504 m²

Ground covered by buildings
11% of the land

2,699 m²

Floor-area ratio
2.99

Floors built per unit of land: 2.99 m² of floors for each m² of land.

Parking
1.09 per home

615 covered, 0 open

Built-up area, all floors
12,31,509 sq ft

1,14,411 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 10 RERA projects of ABHEE VENTURES PRIVATE LIMITED on the map

Complaints to RERA about its other projects

The company

Registered as
ABHEE VENTURES PRIVATE LIMITED
Type
Company
Company number
U45203KA2021PTC153091

CIN or LLPIN, from the Registrar of Companies.

PAN
AAVCA9517E
GSTIN
29AAVCA9517E1Z5

Its other registrations on RERA Karnataka

9 registrations under this company
  • ABHEE CITY URBAN GLENN PHASE II PRM/KA/RERA/1251/308/PR/300926/008986 · approved 30 Sep 2026
  • ABHEE TRANQUILA PRM/KA/RERA/1251/310/PR/020725/007891 · approved 2 Jul 2025
  • ABHEE SERENITY SPRINGS PRM/KA/RERA/1251/308/PR/180325/007592 · approved 18 Mar 2025
  • ABHEE AARIA PRM/KA/RERA/1251/309/PR/050325/007545 · approved 5 Mar 2025
  • ABHEE RIVIERA ROYALE PRM/KA/RERA/1251/310/PR/210324/006722 · approved 21 Mar 2024
  • ABHEE KINGS COURT PRM/KA/RERA/1251/308/PR/020323/005763 · approved 2 Mar 2023
  • ABHEE PRIDE PRM/KA/RERA/1251/308/PR/220223/005739 · approved 22 Feb 2023
  • ABHEE SRISHTI LAYOUT PRM/KA/RERA/1251/308/PR/080223/005701 · approved 8 Feb 2023
  • ABHEE NANDANA BLOCK-C PRM/KA/RERA/1251/446/PR/310522/004944 · approved 31 May 2022

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹46.4 crBuilding and development ₹465.1 crTotal ₹511.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.31 kmReliable
  • Nearest railway station5.14 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.78 kmCaveat

Hospitals

  • Nearest hospital1.71 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.2 kmReliable
  • Nearest sewage treatment plant6.12 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.52 kmCaveat
  • Nearest commercial-airport runway32.47 kmReliable
  • Distance to runway approach-path proxy31.21 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.89669, 77.75197), 2026-10-24. Each figure's source and caveat are in the full report.