Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ABHEE CELESTIAL CITY

by NEXPLACE INFRASTRUCTURE · 399 homes · 4.84 acres · 1 tower · Anekal

Upcoming Under construction, due Jun 2029. 64% built with 52% of the time used. 52% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
64% built

Due 30 Jun 2029. 52% of the time from RERA approval to the deadline has passed.

Built64%
Time used52%
How much is sold?191 left
52% booked

208 of 399 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
82 homes per acre

Similar projects within 3 km: 76 per acre. 82% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started18 Oct 2023
  2. Approved by RERA7 Nov 2023
  3. Today24 Oct 2026

    52% of the time to the deadline has passed.

  4. If it slips like a typical project1 Apr 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2645%
Q4 2025-2654%
Q1 2026-2759%
Q2 2026-2764%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

208 booked191 leftQ2 2026-27

Still available: 37 × 2 BHK, 74 × 2.5 BHK, 78 × 3 BHK, 2 × NA.

Booked, by type

2 BHK42 of 79
2.5 BHK86 of 160
3 BHK80 of 158
NA0 of 2

Booked, each quarter

Q3 2025-26186 of 399
Q4 2025-26197 of 399
Q1 2026-27200 of 399
Q2 2026-27208 of 399

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2.5 BHK
1,001 sq ft
93 m² carpet · sizes 1,001–1,012 sq ft (81 at this size)
48 m² land share · 1 parking space
160 homes · 40% of the project
3 BHK
1,152 sq ft
107 m² carpet · sizes 1,152–1,195 sq ft (79 at this size)
56 m² land share · 1 parking space
158 homes · 40% of the project
2 BHK
807 sq ft
75 m² carpet
38 m² land share · 1 parking space
79 homes · 20% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Abhee Celestial City26 floors

Abhee Celestial City: 399 homes, 81 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project82
Typical within 3 km (48)76
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project82%
Typical within 3 km (49)79%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.84 acres

19,602 m²

Ground covered by buildings
16% of the land

3,153 m²

Floor-area ratio
2.99

Floors built per unit of land: 2.99 m² of floors for each m² of land.

Parking
1.17 per home

465 covered, 0 open

Built-up area, all floors
8,50,940 sq ft

79,055 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
NEXPLACE INFRASTRUCTURE
Type
Partnership Firm
PAN
AASFN1079J
GSTIN
29AASFN1079J1ZL

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.6 crBuilding and development ₹270.9 crTotal ₹288.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹31.3 cr₹31.6 cr
Q4 2025-26₹24.0 cr₹22.1 cr
Q1 2026-27₹14.7 cr₹11.9 cr
Q2 2026-27₹18.2 cr₹10.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.01 kmReliable
  • Nearest railway station4.81 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.42 kmCaveat

Hospitals

  • Nearest hospital1.95 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.91 kmReliable
  • Nearest sewage treatment plant5.77 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.15 kmCaveat
  • Nearest commercial-airport runway32.22 kmReliable
  • Distance to runway approach-path proxy31.03 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.89869, 77.74925), 2026-10-24. Each figure's source and caveat are in the full report.