RERA project · Residential/Group Housing
AADITHYA BLISS
by RT CONSTRUCTIONS · 35 homes · 1.50 acres · 1 tower · Anekal
Past due, no completion filed Past its deadline of 31 Mar 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.
At a glance
The deadline was 31 Mar 2026, and no completion is filed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 73 per acre. 50% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started24 Apr 2023
- Approved by RERA1 Jul 2023
- Deadline31 Mar 2026
Passed with no completion filed.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Aadithya Bliss: 35 homes, 10 m tall
Amenities
- Electricity 150 m²
- CCTV Surveillance 50 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.50 acres
- Ground covered by buildings
- 50% of the land
- Floor-area ratio
- 1.25
- Parking
- 1.17 per home
- Built-up area, all floors
- 90,363 sq ft
6,070 m²
3,038 m²
Floors built per unit of land: 1.25 m² of floors for each m² of land.
41 covered, 0 open
8,395 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
The company
- Registered as
- RT CONSTRUCTIONS
- Type
- Proprietorship Firm
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/010723/006030 · Approved
- Building plan approvedLocal Planing Authority · APA/LAO/70/2022-23 · 30 Dec 2022
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell,Others
Complaints to RERA about this project
None on RERA Karnataka.
Documents
107 files on the RERA page: Approved plan ↗, Commencement certificate ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station10.37 kmReliable
- Nearest railway station8.53 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)0.31 kmCaveat
Hospitals
- Nearest hospital5.27 kmCaveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionSarjapura PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)17.53 kmReliable
- Nearest sewage treatment plant10.1 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)9.27 kmCaveat
- Nearest commercial-airport runway32.05 kmReliable
- Distance to runway approach-path proxy29.22 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.91102, 77.80957), 2026-10-24. Each figure's source and caveat are in the full report.